Building Safety Levy 2026
Guidance on applicability, development thresholds, levy calculations, exemptions, previously developed land and the implications for Building Control applications.
Read the full guide →Practical, plain-English guidance on Building Regulations, construction legislation and the regulatory changes affecting developers across England.
Building Regulations and development requirements continue to change. Our Knowledge Centre is designed to help developers understand upcoming deadlines, transitional arrangements, compliance requirements and the practical steps needed to keep projects moving.
The Building Safety Levy introduces a new charge on certain residential developments in England. Developers should establish whether a project falls within scope and understand the potential financial and programme implications before progressing through Building Control.
The Levy applies under the published implementation arrangements to relevant new Building Control applications from this date.
The position can depend on the development, planning permission, application date, proposed use and other project-specific factors.
Our main regulatory guides explain what is changing, when the changes take effect, who may be affected and what developers should consider now.
Guidance on applicability, development thresholds, levy calculations, exemptions, previously developed land and the implications for Building Control applications.
Read the full guide →Understand the forthcoming changes affecting new homes, including energy performance, heating, renewable energy, ventilation and transitional arrangements.
Read the full guide →What actually counts as commencement under Building Regulations? Learn why foundations alone may not protect a new dwelling and how building-specific transitional arrangements work.
Read the commencement guide →The Building Safety Levy is one of the most immediate regulatory changes for residential developers. Early review can help identify potential cost and programme implications before key decisions are fixed.
The charge is based on chargeable residential floorspace together with the applicable rate for the relevant local authority area.
Qualifying previously developed sites can receive a reduced rate, subject to the detailed eligibility requirements.
Under the published implementation arrangements, applications submitted before 1 October 2026 are outside the Levy. Care is required where an application is rejected and subsequently resubmitted.
The Levy payment or no-charge position will need to be resolved before the relevant completion or final certification process can be concluded.
Regulations rarely affect only one service. Our Knowledge Centre brings together the questions developers face throughout the development lifecycle.
Planning, flood risk, contamination, ecology, BNG, utilities and development due diligence.
Building Control, structural design, SAP/SBEM, Part O, Part G, Part R and fire requirements.
Building Control applications, warranties, commencement requirements and project information.
Inspections, design changes, evidence records, fire stopping, ventilation and coordination.
Air, sound and ventilation testing, EPCs, commissioning and completion certification.
Straightforward answers to common regulatory and compliance questions affecting residential and commercial projects.
Regulatory changes can affect design, programme, Building Control strategy and development cost. The earlier the position is reviewed, the more options a developer normally has available.