Building Safety Levy 2026
Guidance on applicability, development thresholds, levy calculations, exemptions, previously developed land and the implications for Building Control applications.
Read the full guide →Practical, plain-English guidance on Building Regulations, construction legislation and the regulatory changes affecting developers across England.
Building Regulations and development requirements continue to change. Our Knowledge Centre is designed to help developers understand upcoming deadlines, transitional arrangements, compliance requirements and the practical steps needed to keep projects moving.
The Building Safety Levy introduces a new charge on certain residential developments in England. Developers should establish whether a project falls within scope and understand the potential financial and programme implications before progressing through Building Control.
The Levy applies under the published implementation arrangements to relevant new Building Control applications from this date.
The position can depend on the development, planning permission, application date, proposed use and other project-specific factors.
Our main regulatory guides explain what is changing, when the changes take effect, who may be affected and what developers should consider now.
Guidance on applicability, development thresholds, levy calculations, exemptions, previously developed land and the implications for Building Control applications.
Read the full guide →Understand the forthcoming changes affecting new homes, including energy performance, heating, renewable energy, ventilation and transitional arrangements.
Read the full guide →What actually counts as commencement under Building Regulations? Learn why foundations alone may not protect a new dwelling and how building-specific transitional arrangements work.
Read the commencement guide →The Building Safety Levy is one of the most immediate regulatory changes for residential developers. Early review can help identify potential cost and programme implications before key decisions are fixed.
The charge is based on chargeable residential floorspace together with the applicable rate for the relevant local authority area.
Qualifying previously developed sites can receive a reduced rate, subject to the detailed eligibility requirements.
Under the published implementation arrangements, applications submitted before 1 October 2026 are outside the Levy. Care is required where an application is rejected and subsequently resubmitted.
The Levy payment or no-charge position will need to be resolved before the relevant completion or final certification process can be concluded.
Regulations rarely affect only one service. Our Knowledge Centre brings together the questions developers face throughout the development lifecycle.
Planning, flood risk, contamination, ecology, BNG, utilities and development due diligence.
Building Control, structural design, SAP/SBEM, Part O, Part G, Part R and fire requirements.
Building Control applications, warranties, commencement requirements and project information.
Inspections, design changes, evidence records, fire stopping, ventilation and coordination.
Air, sound and ventilation testing, EPCs, commissioning and completion certification.
Straightforward answers to common regulatory and compliance questions affecting residential and commercial projects.
Regulatory changes can affect design, programme, Building Control strategy and development cost. The earlier the position is reviewed, the more options a developer normally has available.
Discuss Your ProjectDeveloper guides
The 10% rule, the metric, exemptions and the gain plan.
Read the guide GuideWhich overheating route your new build needs.
Read the guide GuideWhich conditions stop you starting, and how to clear them.
Read the guide GuidePAS 128 survey levels and when you need one.
Read the guide GuideWhich Part L energy calculation your building needs.
Read the guide GuideWhen you need one, and Phase 1 versus Phase 2.
Read the guide GuidePhase 1 to Phase 4, and why councils ask for them.
Read the guide GuideWhat it covers, why lenders need it and when to arrange it.
Read the guide GuideHow an IBG protects your customers if you stop trading.
Read the guide GuideGetting building regulations sign-off for work already done without approval.
Read the guide GuideWhich regulations apply, U-values, glazing, sound tests and structure.
Read the guide GuideBuilding regulations for a garage conversion: U-values, fire escape, damp and planning.
Read the guide GuideWhere Part B needs them, the E 30 / I 15 standard and fixing rules.
Read the guide GuideConditions to clear before work starts: agreement rules, timings and the risks of starting early.
Read the guide GuideSmall changes to an approved planning scheme under section 96A.
Read the guide GuideBuilding regulations, support options and party wall notices.
Read the guide GuideHow to get one, how long it takes and what to do if it is lost.
Read the guide GuideWhat the engineer checks: floor joists, steel beams, roof support and dormers.
Read the guide GuideHow attic trusses work, room size and the Building Regulations for a room in the roof.
Read the guide GuideBuilding regulations for underpinning: approval, engineer design, inspections and Party Wall notices.
Read the guide GuideWhen you need one, what is recorded and digging your own.
Read the guide GuideThe new bedroom test, 2050s weather and where Part O stands.
Read the guide GuideThe 2029 and 2031 targets and the new duties to assess and fix.
Read the guide GuideFull plans, building notice, council or private.
Read the guide GuidePart B fire strategies: what they cover and when you need one.
Read the guide GuidePart E pre-completion tests, pass levels and avoiding a fail.
Read the guide GuideThe 125 and 110 litre targets and when you need a calc.
Read the guide GuideGuide prices, who needs a test and how to pass first time.
Read the guide GuideThe 25% glazing rule, U-values and when you need a SAP.
Read the guide GuideGuide prices, which SAP you need and what to send us.
Read the guide GuideHow EPCs work for commercial units built as shells: Part L, fit-out, letting and penalties.
Read the guide GuidePlanning and Building Regulations for splitting a house into flats: fire, sound testing, Part L and SAP.
Read the guide GuideHow trees on clay set foundation depth, heave after tree removal, and the tree preservation rules to check first.
Read the guide GuideWhen re-roofing, re-rendering or re-plastering means insulating the whole wall, roof or floor, and the U-values to reach.
Read the guide GuideGuide prices, when you need one and what to send us.
Read the guide GuideWhat the Part L report shows, who signs it and what to do if it fails.
Read the guide GuideGuide prices, how many tests you need and avoiding a fail.
Read the guide GuideGuide prices, who needs a test and how to pass first time.
Read the guide GuideWhen councils ask, the survey months and what happens next.
Read the guide GuideWhen you need one and what the national standards ask for.
Read the guide GuideAlarms, fire doors, licensing and building control for HMOs.
Read the guide GuideBuilding control approval for higher-risk buildings.
Read the guide GuideThe energy hierarchy, the 35% target and carbon offset payments.
Read the guide GuideEvery Part from A to T, and what building control asks for.
Read the guide GuideKnocking through a wall: the calculations and building control.
Read the guide GuideWhich buildings need charge points, the cost cap and sign-off.
Read the guide GuideManagement or refurbishment survey, and when you need one.
Read the guide