Building Regulations Consultants
We arrange building control and the reports and tests it asks for, from structural calculations to SAP, air tests and sound tests, with one project manager for the whole job. This guide sets out every Part of the Building Regulations in plain words.
The Building Regulations set the minimum standards for building work in England. They are split into Parts, and each Part has an approved document from the government that explains how to meet it. Building control checks your plans and the work on site against them, and asks for evidence along the way: calculations, test results and reports.
What a building regulations consultant does
Checking what you need
We look at your drawings and tell you which Parts apply, and which reports, calculations and tests building control will ask for.
Building control
We help you appoint a registered building control approver and send them what they need. We are not an approver ourselves. See private building control.
Reports and calculations
Structural calculations, SAP or SBEM, water calculations, overheating assessments and fire strategies, from one team.
Tests on site
Air tightness, ventilation and sound tests near the end of the build, so the work can be signed off.
Keeping it moving
One project manager follows the job from the first drawing to the completion certificate.
Answering queries
If the building control surveyor asks a question about a report, we pass it to the right specialist and send back the answer.
The Building Regulations, Part by Part
Here is what each Part covers and the evidence building control usually asks for. Where we offer that report or test, the link takes you to it.
| Part and what it covers | What building control usually asks for |
|---|---|
| Part A: Structure Foundations, walls, floors, beams and roofs, so the building stands up safely. |
Structural calculations and drawings for new foundations, beams and other structural work. Structural engineering |
| Part B: Fire safety Escape routes, fire alarms, stopping fire spreading and access for the fire service. |
Fire details on the drawings for most homes, and a fire strategy report for flats, commercial buildings and complex schemes. Fire strategies |
| Part C: Site preparation and resistance to contaminants and moisture Clearing the site, contaminated ground, radon gas and keeping out damp. |
A contamination report where the land may be contaminated, radon protection in affected areas, and damp-proofing details. Contamination reports |
| Part D: Toxic substances Fumes from urea formaldehyde foam used to fill cavity walls. |
Evidence that the wall is suitable for foam fill and that the installer follows the British Standard. |
| Part E: Resistance to sound Sound between homes, and inside homes and rooms such as student rooms. |
Sound tests before completion on separating walls and floors in new homes and conversions, unless a new build uses Robust Details. Sound insulation testing |
| Part F: Ventilation Fresh air, extract fans and the air quality inside. |
Ventilation details on the drawings and, for new homes, airflow tests on the fans with a commissioning record. Ventilation testing |
| Part G: Sanitation, hot water safety and water efficiency Water supply, bathrooms, hot water cylinders and how much water new homes use. |
A water calculation for new homes, to 125 litres a person a day or 110 where planning asks, and certificates for unvented hot water systems. Water calculations |
| Part H: Drainage and waste disposal Foul and rainwater drains, soakaways, septic tanks, building near sewers and bin storage. |
A drainage layout, percolation test results where rainwater goes to a soakaway, and the water company’s agreement to build over or near a public sewer. Soakaway percolation tests |
| Part J: Combustion appliances and fuel storage systems Boilers, wood burners, flues, chimneys and oil tanks. |
A certificate from a registered installer or a building control inspection, and a carbon monoxide alarm where one is needed. |
| Part K: Protection from falling, collision and impact Stairs, ramps, balustrades, low windows and safety glazing. |
Stair, guarding and glazing details on the drawings. Architectural drawings |
| Part L: Conservation of fuel and power Insulation, heating, lighting and the energy the building uses. |
SAP for new homes or SBEM for other buildings, at design stage and as built, an air test on every new home, and an Energy Performance Certificate. SAP calculations, SBEM calculations, Air Tightness Testing |
| Part M: Access to and use of buildings Getting into and around the building, including for wheelchair users. |
Access details on the drawings, and the higher M4(2) or M4(3) standard for homes where the planning permission asks for it. Architectural drawings |
| Part O: Overheating Limiting summer overheating in new homes and other new residential buildings. |
An overheating assessment, by the simplified method or a TM59 dynamic model. Overheating assessments |
| Part P: Electrical safety Electrical work in and around homes. |
An electrical installation certificate from a registered electrician, or a building control inspection. |
| Part Q: Security in dwellings Doors and windows in new homes that resist break-ins. |
Evidence that the doors and windows meet the security standard, such as PAS 24. |
| Part R: Infrastructure for electronic communications Ducts and space for gigabit broadband, and a gigabit connection for new homes. |
Details of the ducts, cabling and connection, often set out in a connectivity plan. Connectivity plans |
| Part S: Infrastructure for charging electric vehicles Charge points and cable routes for new homes and other buildings with parking. |
Charge point and cable route details, and proof the charge points were commissioned. EV charging points |
| Part T: Toilet accommodation Universal and other toilets in new buildings other than homes, and some changes of use. |
Toilet layouts on the drawings. |
| Regulation 7: Materials and workmanship Suitable materials, fitted properly, across every Part. |
Product information and certificates where the surveyor asks for them, and checks on site. |
There is no Part I or Part N. The old Part N, on glazing, was merged into Part K in 2013. New homes also face tighter energy rules from 24 March 2027: see our guide to the Future Homes Standard.
Which reports does my project need?
Extensions
Structural calculations for foundations and any steel, insulation and glazing details for Part L, and drainage details if drains are moved.
Knocking through a wall
Steel beam calculations and fire protection details. See our guide to RSJ calculations.
Loft conversions
Calculations for the new floor and any steel, a safe escape route down the stairs, and insulation details.
New homes
Structural design, SAP, a water calculation, an overheating assessment, an air test, ventilation tests, connectivity and EV charging, plus sound tests for attached homes.
Conversions into flats
A conversion SAP, sound tests between flats, fire safety details and ventilation details.
Commercial buildings
SBEM, an air test, a fire strategy, toilet layouts for Part T and EV charging where there is parking.
Send us your drawings and a short description of the work. We will list what building control is likely to ask for.
How the process works
- Send us your drawings and the site address.
- We tell you which Parts apply and which reports and tests you need, with a free quote.
- Building control is appointed and the design-stage reports are sent in before work starts.
- The Building Control surveyor inspects the work at key stages on site.
- We book the tests near the end of the build and send the results to Building Control.
- Building control issues the completion certificate once everything is signed off.
Who checks the work?
Building control can be your local council or a registered building control approver, which is a private company registered with the Building Safety Regulator. Both check the work against the same regulations. Higher-risk buildings, such as blocks of flats 18 metres or 7 storeys and over, go to the Building Safety Regulator instead.
Our guide Do I need Building Control approval? explains the routes, and the commencement rules explain when work counts as started.
Frequently asked questions
What does a building regulations consultant do?
They work out what your project needs to meet the Building Regulations, then arrange the reports, calculations and tests building control asks for. We also help you appoint building control and answer the surveyor’s queries.
Is building regulations approval the same as planning permission?
No. Planning permission is about what you build and where. The Building Regulations are about how it is built: structure, fire safety, energy, drainage and so on. Many projects need both, and some need only building regulations approval.
Do I need a consultant, or can I go straight to Building Control?
You can apply to building control yourself. A consultant helps when the project needs several reports and tests, so they arrive on time and in the form the surveyor wants.
Are you a Building Control body?
No. We are a building consultancy. We help you appoint a registered building control approver, who checks the work and issues the completion certificate.
What is the newest Part of the Building Regulations?
Part T, on toilet accommodation. It covers universal and other toilets in new buildings other than homes, and in some changes of use.
What if work has already been done without approval?
It can sometimes be signed off through the council’s regularisation process, which may mean opening up the work so it can be checked. We can provide the calculations and reports it asks for.
Get a Free Quote for Your Project
Send us your drawings and the site address, and we will tell you which reports and tests your project needs.