Steel Beam (RSJ) Calculations for Knocking Through a Wall

Knocking through a load-bearing wall means fitting a steel beam, and building control will want structural calculations to show it is the right one. This guide explains what the calculations cover, what building control needs and how the process usually runs.

Free quotesSend your drawings for a price
6-minute readPlain-English guide for developers
Reviewed November 2026Guidance for England
02475 095700Mon to Fri, 9am to 5pm

RSJ stands for rolled steel joist. Most beams fitted in homes today are universal beams, but builders still call them RSJs, and the calculations work the same way. A structural engineer works out what the wall is holding up, chooses a beam that can carry it, and checks the walls or posts at each end. Building control then checks those figures against Part A of the Building Regulations.

Developer guide

Is the wall load-bearing?

A load-bearing wall holds up something above it: floor joists, another wall, part of the roof or a chimney breast. You cannot always tell by looking, and even a timber stud wall can carry load.

Clues include floor joists resting on top of the wall, a wall directly above it upstairs, or a wall running down the middle of the house. If you are not sure, ask a structural engineer before anything is taken out, and never remove part of a wall without temporary support in place.

Developer guide

What the calculations cover

01

Loads

Everything the wall holds up, from floors, walls and roof to people, furniture and snow, worked out storey by storey.

02

The beam

The size and grade of steel, checked for strength and for how much it will bend under load.

03

Bearings and padstones

How far the beam sits on the wall at each end, and the padstone that spreads the load so the brickwork is not crushed.

04

Posts and foundations

Where the beam sits on a new post or pier, whether the foundation below can take the extra weight.

05

Fire protection

How the beam will be protected in a fire, usually with fire-rated plasterboard or intumescent paint.

06

A drawing or sketch

So your builder knows exactly which beam to order and how to fit it.

Developer guide

What Building Control needs

Taking out a load-bearing wall is building work under the Building Regulations, so you need building control approval before you start. You can apply to your council, or use a registered Building Control approver. Building control will usually want:

  • The structural calculations for the beam, bearings and padstones
  • A drawing showing where the beam goes and how it is supported
  • Details of how the beam will be protected from fire
  • Access to inspect the work, usually before the beam is covered up

Once the work is signed off you get a completion certificate. Keep it safe, because a buyer’s solicitor will ask for it when you sell. Our guide Do I need Building Control approval? explains the routes.

If the beam will sit in a wall you share with a neighbour, you may also need to serve a notice under the Party Wall Act before work starts.

Need calculations Building Control will accept?

Send us the drawings and photos of the wall and the rooms above. We will tell you whether a site visit is needed.

How it works

The process, step by step

  1. Send us drawings, or photos and measurements of the wall and the rooms above it.
  2. The engineer reviews them and visits if the structure above is not clear.
  3. The engineer works out the loads and sizes the beam, bearings and padstones.
  4. You get the calculations and a drawing for Building Control and your builder.
  5. Building control approves them, or raises a query that we pass to the engineer.
  6. Your builder props the floors above, takes out the wall and fits the beam.
  7. Building control inspects the work and issues a completion certificate at the end.
How it works

How long does it take?

It depends mostly on how clear the information is. A single beam with good drawings is the quickest job. A site visit, an unclear structure above, or several beams and posts will take longer. We give you a timescale with your quote.

Building control then needs time to check the design, so allow for that before your builder’s start date. Order the steel once the calculations are approved, as the beam is made to the length and size the engineer specifies.

Developer guide

Who can do the calculations?

The Building Regulations do not name one qualification. Since October 2023, anyone doing design work must have the skills, knowledge and experience for it. In practice that means a structural engineer, and building control decides whether the submission shows the work meets Part A. See our Structural Engineering service.

Your questions

Frequently asked questions

Do I need calculations to knock through a wall?

Yes, if the wall is load-bearing. Building control will want structural calculations for the new beam and its supports before the work is signed off.

What does RSJ stand for?

Rolled steel joist. Most beams fitted today are universal beams, but RSJ is still the name most people use for a steel beam.

Can my builder choose the beam size?

Building control needs to see that the beam has been properly designed, so a builder’s guess will not be enough. A structural engineer sizes the beam and its supports, and your builder fits what is on the drawing.

Does a steel beam need fire protection?

Usually, yes. Steel loses strength quickly in a fire, so the beam is normally boxed in with fire-rated plasterboard or coated with intumescent paint. Plan how it will be finished before it goes in.

What is a padstone?

A block of concrete or strong brick under each end of the beam. It spreads the load into the wall below so the brickwork or blockwork is not crushed. The calculations give its size.

Does an engineer need to visit?

Not always. A simple opening can often be designed from good drawings and photos. A visit is more likely where the structure above is unclear, such as an old house or a chimney breast above.

The wall has already been taken out. What now?

Retrospective calculations may be possible, but the installed beam has to be checked. That can mean opening up the ceiling or plaster so the beam and bearings can be seen.

How much do RSJ calculations cost?

Each job is priced on your drawings. The main things are how many beams and posts are needed, whether a site visit is needed and whether you need a drawing as well. Send us your drawings or photos for a free quote.

Get a Free Quote for Your Project

Send us your drawings, or photos and a sketch of the opening, and we will arrange a free quote for the calculations.

Last reviewed: November 2026. Checked against Approved Document A (Structure) on GOV.UK and the Building Regulations competence rules. General guidance for England only. Get project-specific advice before relying on it.