Future Homes Standard starts 24 March 2027. Is your site caught? Check in 30 seconds →
Mon–Fri 9am–5pm02475 095700
Planning Flood Risk & Drainage Support

Flood Risk Assessments

A Flood Risk Assessment shows the council that your development will be safe from flooding and won’t make flooding worse nearby. You need one in Flood Zones 2 and 3, and on larger or at-risk sites in Zone 1. We prepare them for homes, extensions, conversions and commercial schemes.

Planning Support Assessments prepared for submission
Multiple Flood Sources Rivers, surface water and groundwater
Practical Mitigation Clear recommendations for the design team
Nationwide Service Residential and commercial projects

Flood Risk Support for Planning and Development

A Flood Risk Assessment examines whether a proposed development could be affected by flooding and whether it may increase flood risk elsewhere. It considers the site, proposed use, surrounding drainage network and available mapping or flood-model information.

One Stop Consult coordinates experienced flood-risk and drainage consultants to assess potential flooding from rivers, the sea, surface-water runoff, groundwater, sewers, reservoirs and other relevant sources.

The final assessment can support a planning application by explaining the level of risk, identifying suitable mitigation and demonstrating how the proposed development can remain safe and appropriate over its lifetime.

Planning Requirements

When May a Flood Risk Assessment Be Required?

Requirements depend on the site's location, development type, Planning Authority and identified flood-risk constraints.

Flood Zones 2 and 3

Development proposed within areas identified as having a medium or high probability of river or sea flooding.

Sites Over One Hectare

Larger sites in Flood Zone 1 where surface-water management and wider flood risk must still be considered.

Surface-Water Risk Areas

Sites affected by mapped surface-water flow routes, ponding or local drainage constraints.

Change of Use

Conversions that introduce a more vulnerable use into an area where flooding may affect occupants or safe access.

Planning Conditions

Developments where an approved flood-risk or drainage strategy must be submitted or updated before works progress.

Local Flooding Concerns

Sites with known drainage problems, historic flooding, nearby watercourses or groundwater constraints.

Potential Sources of Flooding

Flood risk can arise through several mechanisms, and a robust assessment should consider all sources that may be relevant to the site.

The available evidence is reviewed to establish which risks require detailed assessment and which can reasonably be screened out.

Rivers and watercourses
Tidal and coastal flooding
Surface-water runoff
Groundwater emergence
Sewer flooding
Reservoirs and artificial sources
Canals and drainage channels
Flooding from surrounding land
Assessment Scope

What the Flood Risk Assessment May Include

The report is tailored to the site, development proposal and relevant planning requirements.

Site and Development Review

Description of the existing site, proposed development, ground levels, access and surrounding land uses.

Flood-Zone Appraisal

Review of available flood mapping, strategic assessments and other relevant published information.

Historical Flood Information

Consideration of known flooding incidents, local records and previous site or area studies where available.

Climate-Change Allowances

Review of how future climate change may affect flood levels, rainfall intensity and long-term site resilience.

Safe Access and Egress

Assessment of whether occupants can safely enter and leave the site during a flood event where this is relevant.

Mitigation Strategy

Clear recommendations covering finished-floor levels, layout, resilience, drainage and other appropriate measures.

Risk Reduction

Flood Mitigation Measures

The appropriate measures depend on the type and severity of risk, site constraints and proposed use.

Finished-Floor Levels

Raising internal floor levels where appropriate to reduce the likelihood of floodwater entering the building.

Flood-Resilient Design

Using suitable materials, services locations and construction details to reduce damage and speed recovery.

Site Layout

Positioning more vulnerable uses away from higher-risk parts of the site where possible.

Safe Access Routes

Identifying suitable routes, refuge measures or management arrangements where flood access is a concern.

Surface-Water Management

Controlling runoff through suitable drainage, storage and discharge arrangements.

Flood Warning and Management

Operational measures, warning arrangements or emergency planning where these form part of the risk strategy.

How the Flood Risk Assessment Process Works

The assessment starts with a review of the proposal, planning requirement and available site information.

Review the site location and development proposal.
Confirm the relevant planning and flood-risk requirements.
Review available mapping, records and model information.
Assess all relevant sources of flooding.
Develop suitable mitigation and design recommendations.
Prepare the final report for submission.
1

Initial Review

Confirm the site, proposal, planning requirement and available supporting information.

2

Data Review

Review flood maps, local evidence, watercourse information and relevant strategic documents.

3

Risk Appraisal

Assess the likelihood, depth, source and potential impact of flooding.

4

Mitigation Design

Identify suitable floor levels, layout changes, resilience and drainage measures.

5

Final Assessment

Issue the completed Flood Risk Assessment for the planning application or condition submission.

Information Required for a Quotation

Provide the full site address, a description of the proposed development and the latest architectural drawings.

Please also send the relevant planning-policy wording, validation requirement, pre-application comments or planning condition, together with any available topographical survey, drainage information or previous flood reports.

Project Types

Flood Risk Assessments for a Range of Developments

The assessment is adapted to the size, use, vulnerability and location of the proposed development.

Nationwide Flood Risk Assessment Service

One Stop Consult coordinates Flood Risk Assessments for residential, commercial and mixed-use developments throughout mainland UK. Each assessment is tailored to the relevant Planning Authority, site constraints and available flood-risk information.

Complete Planning and Drainage Support

Other Services Your Project May Require

Flood Risk Assessments are often coordinated alongside drainage, planning and environmental services.

The Planning Rules for Flood Risk

In England, the National Planning Policy Framework (August 2026, policies F4 to F8) and the Environment Agency’s guidance for applicants set out when an assessment is needed and what it must show.

The flood zones: Zone 1 has less than a 0.1% chance a year of river or sea flooding. Zone 2 has between 1% and 0.1% from rivers, or 0.5% and 0.1% from the sea. Zone 3a is higher than that. Zone 3b is the functional floodplain, where water has to flow or be stored.
When you need one: for all development in Zones 2, 3a and 3b, including small works and changes of use. In Zone 1, for sites of 1 hectare or more, land the Flood Map for Planning shows at risk of surface water or future flooding, and areas with critical drainage problems.
The sequential test: new development should go on the lowest-risk land available. Where it applies, you must show there are no suitable sites at lower risk. Householder work, non-residential extensions under 250 m² and most changes of use are exempt.
The exception test: some uses in Zones 2 and 3 must also show wider benefits to the community, that they will be safe for their lifetime, and that they will not increase flood risk elsewhere. The assessment provides the evidence.
Drainage: where a scheme could affect drainage, or the site is at risk of flooding, you also need a sustainable drainage strategy to the national SuDS standards. It can sit inside the assessment or alongside.
Wales: different rules apply, set out in Technical Advice Note 15 and Natural Resources Wales’ own Flood Map for Planning. Tell us where the site is and we will work to the right rules.

Important Flood Risk Assessment Information

Flood Risk Assessment requirements vary between Planning Authorities, development types and individual sites. The scope, conclusions and recommended mitigation depend on the available data, proposed design, climate-change allowances and project stage. Additional modelling, surveys, drainage design or consultation may be required where the available evidence is limited or the risk is complex. One Stop Consult provides consultancy and coordination support through its specialist flood-risk and drainage consultant network.

Frequently Asked Questions

Flood Risk Assessment FAQs

What is a Flood Risk Assessment?

It is a technical report assessing whether a development may be affected by flooding, whether it could increase flood risk elsewhere and what mitigation may be required.

Do I need a Flood Risk Assessment in Flood Zone 1?

Sometimes. In Flood Zone 1 you need one for a site of 1 hectare or more, for land the Environment Agency’s Flood Map for Planning shows at risk of surface water flooding now or in future, for land expected to move into a higher flood zone with climate change, and in areas with critical drainage problems (at present only in Devon and Cornwall). Outside these, most Zone 1 sites need no assessment unless the council’s own policy asks for one.

What types of flooding are considered?

The assessment may consider rivers, the sea, surface water, groundwater, sewers, reservoirs, canals and other relevant sources.

Does the report include drainage design?

A drainage strategy may be included or separately required, depending on the planning request and agreed scope.

Can you review Environment Agency flood data?

Yes. Available mapping, model outputs and other relevant flood information can be reviewed as part of the assessment.

Can an FRA help discharge a planning condition?

Yes. Where a condition requests a Flood Risk Assessment, mitigation update or drainage information, the report can be prepared around the wording of that condition.

Is a Flood Risk Assessment required for permitted development?

Not for work that needs no application at all, such as most house extensions built under permitted development. But some permitted development rights need prior approval from the council, including some changes of use to homes, such as offices, shops or farm buildings into houses. Where the site is at risk of flooding, flood risk is part of that prior approval and the application must include a site-specific Flood Risk Assessment.

Do householders need a Flood Risk Assessment?

If you are applying for planning permission for an extension, outbuilding or similar work in Flood Zone 2 or 3, the council will normally expect one. A householder assessment is shorter and simpler than one for new homes, and often follows the Environment Agency's standing advice for minor extensions, which covers floor levels and flood-resistant construction. In Flood Zone 1 one is not normally needed unless the council has flagged the area for drainage problems or future flood risk.

How long is a Flood Risk Assessment valid for?

There is no fixed expiry date. The assessment stays relevant while the design, the site and the flood information it relies on stay the same. If the scheme changes, a new planning application is made, or the Environment Agency updates its flood maps or climate-change allowances, the council can ask for it to be updated.

Do you provide Flood Risk Assessments nationwide?

Yes. We coordinate suitable flood-risk consultants for eligible projects throughout mainland UK.

Can I do my own flood risk assessment?

For a simple, low-risk job such as a house extension, GOV.UK says you may be able to, by following the Environment Agency’s advice for minor extensions (up to 250 m² of floor space). For new homes, conversions and larger schemes you will usually need a specialist. The council can refuse an application if the assessment is missing or not good enough.

How do I check which flood zone I am in?

Use the Environment Agency’s Flood Map for Planning on GOV.UK. Enter the postcode, draw your site boundary and it shows the flood zone, surface water risk and future flood risk, and lets you download a map for your application. The “check long term flood risk” service is meant for homeowners and is not suitable for planning.

What is the sequential test?

It is the planning test that steers new development to land with the lowest risk of flooding. Where it applies, you must show there are no suitable sites reasonably available at lower risk. It is not needed for householder work, non-residential extensions under 250 m², most changes of use, or sites already allocated in the local plan.

What is the exception test?

For some uses in Flood Zones 2 and 3, passing the sequential test is not enough. The development must also bring wider benefits to the community that outweigh the flood risk, be safe for its lifetime, and not increase flood risk elsewhere. A site-specific Flood Risk Assessment provides the evidence.

How long does Environment Agency flood data take to arrive?

A copy of the flood map can be downloaded straight away. The detailed data most assessments need, the Environment Agency’s “product 4” with modelled flood levels and past flood records, is sent by the local Environment Agency team within 20 working days of the request, so it is worth asking for it early.

Request Your Free Flood Risk Assessment Quote

Complete the form below with the site address, proposed development and current project stage. Upload any available drawings, planning requirements, topographical information and previous reports so our team can review the project and coordinate an appropriate quotation.

Get Your Free Quote Today

Complete the form below and we'll provide a free, no-obligation quotation for your project.

Additional Services for Your Project (Optional)

Need more than one service? Select any additional services below and we'll include them in your quotation.





Not sure what else your project needs?Answer three questions and get the full checklist, then one quote for the lot.
Try the services finder
Call usGet a free quote