Future Homes Standard starts 24 March 2027. Is your site caught? Check in 30 seconds →
Mon–Fri 9am–5pm02475 095700
Who we help: developers and housebuilders

From your second home to your twentieth

Building Control, ground reports, structural design, SAP and testing on every plot, and PCC sign-off at the end. Planned once, repeated across the site, through one point of contact.

One Point of ContactEvery report, test and certificate through one team
560+ Projects Since 2018From single plots to 254 apartments
Free Advice, AlwaysAsk before you commit to anything
No Project Management FeesYou pay for the services you use

Our record with developers

  • 47schemes of 2 to 9 homes since 2018
  • 177homes on those schemes
  • 10schemes of 11+ homes
  • 254apartments on our largest scheme

Small schemes are the size we know best

Since 1 October 2026, residential developments of 10 or more homes pay the new Building Safety Levy, and schemes of fewer than 10 are exempt. Many housebuilders are now planning more schemes of nine homes or fewer.

That’s the size we know best. Since 2018 we’ve supported 47 schemes of 2 to 9 homes, 177 homes in all, as well as larger developments up to 254 apartments.

We can also check early whether a scheme is likely to fall within the levy. The levy follows the planning permission, so splitting one permitted site into smaller building control applications doesn’t avoid it. We’ll always give you a straight answer, but we never promise a levy outcome.

Developer schemes

Schemes we’ve supported, town and service only

On a multi-plot site the cost of getting compliance wrong multiplies, so we plan it once and repeat it on every plot.

Nuneaton, 10 homes

Every compliance service apart from the warranty, for a local developer we’ve delivered several schemes for.

Ansley, 8 homes

Terraced houses and one-and-a-half-storey semis for the same repeat developer.

Ibstock, Leicestershire, 2 homes

A house and a bungalow on a backland plot, with ten services from the Phase 1 and utility surveys through Building Control, SAP, testing and PCC sign-off.

Bonehill, Tamworth, 4 homes

Building Control, PCC, foundation design, the roof truss package and the insulation supplied.

Bedworth, 8 flats

PCC sign-off, with block and beam ground floors, hollowcore upper floors and roof trusses supplied and fitted.

Newhall, Swadlincote, 9 homes

Building Control, PCC, and air and ventilation testing on a site with old mine workings nearby.

Melton Mowbray, 8 homes

A former workhouse and hospital turned into four houses and four flats, with 13 services including Building Control, PCC, SAP, testing, a fire risk assessment, insulation and solar PV.

Wellsborough, Leicestershire

Building Control and warranty introduction on a scheme that went on to win a regional property award.

Eastrea, Whittlesey, 19 homes

Building Control coordination for the whole scheme.

What developers get from us

One team for the whole site, not a new consultant per plot.

One contact for the whole site.
Quotes per plot and per service, so you see exactly what you’re paying for.
Cost-engineered foundations and floors, with floors, trusses and insulation at trade rates to protect your margin.
No project management fees.
Coordination with the Building Control body you choose, respecting its independence.

What our clients say

“Their support was a massive help on our first major development, and we would not hesitate to use them again.”

Mel S., developer

Get a free quote

Frequently Asked Questions

Developer questions

Can you price the whole scheme up front?

Yes. We quote per plot and per service, so you can see exactly what you’re paying for and add or drop services as the scheme changes.

Do you work with my chosen Building Control body?

Yes. We coordinate with whichever Building Control body you choose and respect its independence. We are not a Building Control body ourselves.

Will my scheme pay the Building Safety Levy?

Schemes of fewer than 10 homes are exempt. The levy applies to applications from 1 October 2026 and follows the planning permission, so splitting a permitted site into smaller building control applications doesn’t avoid it. Our levy calculator shows every council’s rates.

Can you supply floors and trusses as well as reports?

Yes: block and beam and hollowcore floors, roof trusses, joists and insulation at trade rates.

Request your free scheme quote

Send the site address, the number of homes and any drawings. We’ll come back with a fixed quote per plot and per service.






Not sure what else your project needs?Answer three questions and get the full checklist, then one quote for the lot.
Try the services finder
Call usGet a free quote