Havenfield Road

High Wycombe

Four flats in a two-storey residential building for a repeat client on Havenfield Road, High Wycombe.

Havenfield Road, High Wycombe - Four-flat residential building
Scheme
Four-flat residential building
Type
New build
Site inspections
9
Services
2
Status
Complete

The story of the job

This is a two-storey residential building of four flats on land off Havenfield Road in High Wycombe. It was built for a repeat client who specialises in passive house building and delivers homes for social housing tenants.

We procured the Building Control and the 10 Year Structural Warranty and followed the job through site. At the first visit in March 2023 piling was complete, the ring beam was finished and a radon barrier was in position across it, taped to the sub base membrane.

The superstructure followed through 2023 on a sole plate over a damp-proof course, with precast concrete beams, gusset ply struts and non-combustible board going on. The roof design was changed several times by the manufacturer, so the visits that autumn concentrated on the roof and on smoke ventilation to the communal areas.

By July 2025 roof tiling was complete and the automatic opening vent to the staircase was fitted. At our November 2025 visit the outside of the building was finished and the last internal work was running on the ground floor. The job has since been completed.

01

The challenge

The building sits on piles and a ring beam, with a radon barrier taped across it to the sub base membrane. The superstructure was then built up on a sole plate with precast concrete beams. The roof design changed several times along the way.

02

How we ran it

We made nine visits between March 2023 and November 2025, following the job from the ring beam through the superstructure and roof to the internal work. Stages were walked with the site manager on each visit. Smoke ventilation to the communal stair was covered as the building came together.

03

The result

By July 2025 roof tiling was complete and the automatic opening vent to the staircase was fitted. The outside of the building was finished by November 2025, with the last internal work then running on the ground floor, and the job has since been completed.

On site

The build, stage by stage

  1. Havenfield Road, High Wycombe - Foundations

    Mar 2023

    Foundations

    Piling and the ring beam were complete, with a radon barrier in position and taped to the sub base membrane.

  2. Havenfield Road, High Wycombe - Walls

    May 2023

    Walls

    The ground floor superstructure went up on a sole plate with a damp-proof course beneath it.

  3. Havenfield Road, High Wycombe - Roof

    Sep 2023

    Roof

    The roof went on over the frame, with its design revised by the manufacturer along the way.

  4. Havenfield Road, High Wycombe - First fix

    Nov 2023

    First fix

    Internal work moved on and smoke ventilation to the communal areas was covered with the site manager.

  5. Havenfield Road, High Wycombe - Finishes

    Nov 2025

    Finishes

    The outside of the building was finished and the last internal work was running on the ground floor.