Future Homes Standard starts 24 March 2027. Is your site caught? Check in 30 seconds →
Mon–Fri 9am–5pm02475 095700

Case study

Fly By Nite Rehearsal Studios

Redditch

A £6 million, arena-sized production rehearsal studio in Redditch, with 1,600 square metres of clear floor.

Fly By Nite Rehearsal Studios, Redditch - arena-sized production rehearsal studio
Scheme
Arena-sized production rehearsal studio
Type
Commercial
Services
2
Status
Complete

The story of the job

Fly By Nite Rehearsal Studios is an arena-sized, purpose-built production rehearsal studio in Redditch, just south of Birmingham. The press has described it as Europe's largest purpose-built production rehearsal facility. This was a £6 million build and one of the biggest jobs we had taken on at the time. Work started in March 2015.

The main space is an uninterrupted floor 42 metres wide by 39 metres long, 1,600 square metres in all, with 18.5 metres of height clearance. That is enough to drive in any truck or rig. The roof has a 500 tonne weight capacity, and there are air-conditioned dressing rooms and a helipad on the roof.

We were appointed to carry out Building Control and Building Compliance Testing. A building like this does not fit a standard pattern, so we worked with the contractor on the structural engineering, acoustic details and fire strategy, and carried out regular site inspections throughout the development.

We also introduced the contractor who completed the specialist polished concrete floor finish, which is the surface the productions now set up on.

01

The challenge

An arena-sized studio needs 1,600 square metres of floor with no columns, 18.5 metres of clear height and a roof with a 500 tonne capacity. Those loads had to go through the frame and into the foundations, and the building also had to meet its acoustic and fire strategy requirements.

02

How we ran it

We were appointed for Building Control and Building Compliance Testing. We worked with the contractor on the structural engineering, acoustic details and fire strategy, and carried out regular site inspections throughout. We also introduced the contractor for the specialist polished concrete floor.

03

The result

The finished building gives productions a 42 by 39 metre uninterrupted floor, air-conditioned dressing rooms and a helipad on the roof. It has since won a TPi Award as a favourite rehearsal facility.

On site

The build, stage by stage

  1. Fly By Nite Rehearsal Studios, Redditch - Foundations

    Stage 1

    Foundations

    Heavy reinforced concrete bases were formed to carry the frame and roof loads.

  2. Fly By Nite Rehearsal Studios, Redditch - Steel frame

    Stage 2

    Steel frame

    The steel frame went up to full height, ready for the long-span roof.

  3. Fly By Nite Rehearsal Studios, Redditch - Roof

    Stage 3

    Roof

    Long-span roof steelwork was fixed so the whole studio floor stays clear of columns.

  4. Fly By Nite Rehearsal Studios, Redditch - Cladding

    Stage 4

    Cladding

    Cladding closed the building in, with four large loading doors along the main elevation.

  5. Fly By Nite Rehearsal Studios, Redditch - Studio

    Stage 5

    Studio

    The main space was finished with a polished concrete floor, 42 metres wide by 39 metres long.

  6. Fly By Nite Rehearsal Studios, Redditch - Complete

    Stage 6

    Complete

    The finished building opened with air-conditioned dressing rooms and a helipad on the roof.

Call usGet a free quote