Former Melton Hospital

Melton Mowbray

An 1836 workhouse, later St Mary's Hospital, converted into four apartments and four houses in Melton Mowbray.

Former Melton Hospital, Melton Mowbray - Hospital conversion, four apartments and four houses
Scheme
Workhouse conversion, four apartments and four houses
Type
Conversion
Site inspections
7
Services
8
Status
Final sign-off

The story of the job

This building started life in 1836 as the Melton Mowbray Union Workhouse, designed by Charles Dyer on an elongated H-shaped plan. It later became St Mary's Hospital, which closed in 2015. The council recognises the central block and wings as a heritage asset, so the job was about keeping the old building and fitting new homes inside it.

Phase 1 of the conversion on Thorpe Road created four apartments and four houses within the original building.

We coordinated Building Control and the 10 Year Structural Warranty, along with SAP calculations for the conversion, air tightness, sound insulation and ventilation testing, Energy Performance Certificates and water efficiency calculations.

In May 2025 the existing external walls were being repointed while internal wall foundations and new concrete block separating partitions went in. New ground floors followed on a type 1 sub base with polythene membrane and A252 mesh. By August 2025 universal steel beams sat on concrete padstones to the structural engineer's design and the new first floor was going in on engineered joists.

A new ridge beam went into the existing roof by October 2025. In January 2026 plasterboarding was under way in the ground floor flats, the first floor flats were being decorated and the houses were at second fix with sanitaryware and tiling. At the July 2026 visit all internal and external works were complete. Building Control has started issuing the final certificates, with the last few to follow.

01

The challenge

Four apartments and four houses had to fit inside a building dating from 1836. That meant new internal foundations, block separating walls and a new first floor inside the old external walls. The existing walls were repointed and a new ridge beam went into the existing roof.

02

How we ran it

We made seven inspection visits through the conversion. They covered the internal foundations, new ground floors, steelwork on padstones, the new first floor and roof, then plasterboarding and second fix. Alongside them we coordinated SAP calculations for the conversion, air tightness, sound insulation and ventilation testing, Energy Performance Certificates and water efficiency calculations.

03

The result

At the visit on 22 July 2026 all internal and external works were complete across the four townhouses and four apartments. Building Control has started issuing the final certificates, with the last few to follow.

On site

The build, stage by stage

  1. Former Melton Hospital, Melton Mowbray - Floors

    May 2025

    Floors

    New ground floors were prepared with a type 1 sub base, polythene membrane and A252 mesh on spacers for 40mm cover.

  2. Former Melton Hospital, Melton Mowbray - Walls

    Aug 2025

    Walls

    Universal steel beams went onto concrete padstones, new block partition walls went up and the new first floor went in on engineered joists.

  3. Former Melton Hospital, Melton Mowbray - Roof

    Oct 2025

    Roof

    A new ridge beam was installed to the existing roof.

  4. Former Melton Hospital, Melton Mowbray - Finishes

    Jan 2026

    Finishes

    Plasterboarding was under way in the ground floor flats, the first floor flats were being decorated and the houses were at second fix.

  5. Former Melton Hospital, Melton Mowbray - Works complete

    Jul 2026

    Works complete

    All internal and external works were complete, with the new roof covering finished with a mechanically fixed ventilated ridge.

One point of contact

Where we fitted in

Before site

Design, calculations and surveys

  • SAP Calculations (Conversion)
  • Water Efficiency Calculations

During the build

Approvals, cover and materials

  • Building Control
  • 10 Year Structural Warranty

At sign-off

Testing and certificates

  • Air Tightness Testing
  • Sound Insulation Testing
  • Ventilation Testing
  • Energy Performance Certificates