Future Homes Standard starts 24 March 2027. Is your site caught? Check in 30 seconds →
Mon–Fri 9am–5pm02475 095700

Case study

High Street

Harrow

A six-storey block of 33 apartments replacing an office building on High Street, Harrow.

High Street, Harrow - 33-apartment block
Scheme
33-apartment block
Type
New build
Site inspections
12
Services
2
Status
In progress

The story of the job

This job replaces an existing office building on High Street, Harrow with a six-storey residential block of 33 apartments. It came to us through a recommendation from a new client.

We manage and coordinate Building Control through a registered partner, along with the 10 Year Structural Warranty. Our visits started in December 2024 with a site meeting to agree the warranty stages, while the site strip was under way to evaluate the formation level.

The structure is reinforced concrete and the visits have followed it up the building. Reinforcement was checked to the structural engineer's design at the base, then at the columns and lift, then floor by floor, with concrete cover checked as it went.

By August 2026 the floor 6 reinforcement was in. At the October 2026 visit the external steel framing system was installed, with 15mm fire board to the external face and fire-rated insulation in the frame. The job is still running, with 12 visits so far.

01

The challenge

The job meant taking down an existing office building on the High Street and putting six storeys and 33 apartments in its place. The ground was stripped to evaluate the formation level, and the lower half of the site was reduced before foul drainage and the sub base went in.

02

How we ran it

We agreed the warranty stages at a site meeting in December 2024 and have inspected against them on 12 visits so far. Each visit walked the reinforcement with the site team, from the base through the columns and lift to each floor in turn. Steel was checked against the structural engineer's design, with minimum concrete cover checked as the floors went up.

03

The result

The job is still in progress. By October 2026 the reinforcement had reached floor 6 and the external steel framing, fire board and insulation were going on.

On site

The build, stage by stage

  1. High Street, Harrow - Foundations

    Feb 2025

    Foundations

    Steel reinforcement went in to the structural engineer's design, with Block A around 90% done.

  2. High Street, Harrow - Walls

    Apr 2025

    Walls

    Concrete was poured to the columns and reinforcement went in to further columns and the lift, with minimum 40mm cover maintained.

  3. High Street, Harrow - Floors

    Jun 2025

    Floors

    Reinforcement to the first floor was installed to the structural engineer's design and walked on site.

  4. High Street, Harrow - Floors

    Aug 2026

    Floors

    The floor 6 reinforcement was installed to the structural engineer's design, with the engineer's inspection.

  5. High Street, Harrow - Walls

    Oct 2026

    Walls

    The external steel framing system went in, with 15mm fire board to the external face and fire-rated insulation in the frame.