London Plan Energy Statements
London Plan energy statements: From £495 + VAT. Guide price. Get a free quote for your project. We write the full energy assessment for London schemes, including the Greater London Authority’s carbon reporting spreadsheet.
Planning applications in London are judged against the Mayor’s London Plan as well as the borough’s own local plan. For major schemes that means an energy statement set out the way the Greater London Authority asks for it, with the carbon figures in its own spreadsheet. This guide explains who needs one, the four steps, the targets and what we send you.
Does your London scheme need one?
Major developments
Yes. The London Plan says every major development should include a detailed energy strategy. Generally that means 10 or more homes, a housing site of 0.5 hectares or more, or 1,000 square metres or more of other floor space.
Smaller schemes
Often. Many boroughs ask smaller developments for an energy statement through their own local plan, so check the borough’s validation list or send it to us.
Schemes referred to the Mayor
Yes, and these also need a whole life-cycle carbon assessment. See our whole life carbon assessments.
Planning conditions
If your permission asks for an updated energy strategy or as-built figures, see our guide to discharging planning conditions.
The four steps: Be Lean, Be Clean, Be Green, Be Seen
The London Plan calls this the energy hierarchy. The statement works through it in order and shows the carbon saved at each step.
Be Lean
Use less energy. Better insulation, glazing and airtightness, and efficient services, come before anything else.
Be Clean
Supply energy efficiently and cleanly. Use local sources where they exist, such as a heat network or waste heat.
Be Green
Make, store and use renewable energy on site, for example with heat pumps and solar panels.
Be Seen
Monitor, check and report how the building really performs once people are using it.
The targets in plain words
| What the London Plan asks of major schemes | The figure |
|---|---|
| Overall aim | Net zero carbon |
| Carbon saved on site, beyond Building Regulations | At least 35% |
| Saved by energy efficiency alone: homes | 10% |
| Saved by energy efficiency alone: other buildings | 15% |
| What homes are expected to aim for on site | 50% or more |
| Anything left over | Paid into the borough’s carbon offset fund, or met off site if the borough agrees |
Applications made since 1 January 2023 must use the Greater London Authority’s 2022 guidance and spreadsheet, which measure these savings against Part L 2021 of the Building Regulations. The guidance also asks for the expected energy use per square metre and the heating demand of the building.
How the carbon offset payment works
If a major scheme cannot reach net zero carbon on site, the carbon left over is paid for through the borough’s carbon offset fund. The borough sets the price, based on a national carbon price or on what it costs to save carbon locally. The London Plan was tested at £95 a tonne, which boroughs may use, so check the figure with your borough.
A better design on site means a smaller payment, so it pays to get the energy strategy right before the layout is fixed.
Overheating and the cooling hierarchy
The same energy strategy has to show how a major scheme will avoid overheating without relying on air conditioning. The London Plan sets an order to follow:
- Keep heat out, through orientation, shading, glazing and insulation
- Cut the heat made inside the building
- Manage heat with exposed thermal mass and high ceilings
- Passive ventilation
- Mechanical ventilation
- Active cooling, only as the last step
The Greater London Authority also expects dynamic overheating modelling to CIBSE guidance as part of the energy strategy. We can run the Overheating Assessment for your London site alongside the energy statement, so both use the same model. Our guide explains the simplified method and TM59.
Send us the plans, the number of homes or the floor area, and any comments from the planning officer.
What we send you
- A review of the London Plan and your borough’s energy policies
- Baseline carbon figures from SAP or SBEM modelling
- The carbon saved at each step of the energy hierarchy
- The Greater London Authority’s spreadsheet, filled in
- Energy use and heating demand figures for the building
- The carbon left over, for any offset payment
- How the scheme follows the cooling hierarchy
- A clear statement, ready to submit with your application
What to send us for a quote
- Site address and borough
- Plans, elevations and sections
- Number of homes or floor area, and the building uses
- Planning officer comments, pre-app advice or condition wording
- Your heating and ventilation ideas so far, if you have them
Is the London Plan changing?
A draft new London Plan was out for consultation from 16 July to 15 October 2026. Until it is adopted, the London Plan 2021 remains the Mayor’s plan, and this guide follows it and the 2022 energy guidance. If the rules change while your scheme is in planning, we will tell you what it means for your statement.
Frequently asked questions
How much does a London Plan energy statement cost?
London Plan energy statements are From £495 + VAT. Guide price. Get a free quote for your project: send us your drawings and the borough’s requirements.
Do you fill in the Greater London Authority’s spreadsheet?
Yes. For major schemes we write the full energy assessment and fill in the carbon emissions reporting spreadsheet, which has to be sent with it.
How is a London Plan energy statement different from a normal one?
Outside London, an energy statement answers the local council’s own policy. In London it must also follow the Mayor’s energy hierarchy, meet the London Plan carbon targets and include the Greater London Authority’s spreadsheet. For schemes elsewhere, see our Energy Statements page.
My scheme is under 10 homes. Do I still need one?
Possibly. The London Plan rules are for major developments, but many boroughs ask smaller schemes for an energy statement too. Send us the address and we will check what your borough asks for.
What is a carbon offset payment?
If a major scheme cannot reach net zero carbon on site, the carbon left over is paid for through the borough’s carbon offset fund. The borough sets the price per tonne, and the money must be spent on projects that cut carbon elsewhere.
What does Be Seen mean?
Major developments must monitor and report their energy use once the building is finished, for at least five years, through the Greater London Authority’s online portal. Figures are reported at planning, as built and in use.
Do I need an Overheating Assessment as well?
Major schemes must show how they follow the cooling hierarchy, and new homes also have to meet Part O of the Building Regulations. We can do both alongside the energy statement.
Can you work with our architect and planning consultant?
Yes. We work from your drawings and answer the planning officer’s energy comments. You have one project manager for the whole job.
Get a Free Quote for Your Project
Send us your drawings and the borough’s wording, and we will confirm what your energy statement needs to cover.
Last reviewed: November 2026. Checked against the London Plan 2021 (Policies SI 2 and SI 4) and the Greater London Authority’s Energy Assessment Guidance 2022 and its June 2022 cover note. General guidance for London only. Get project-specific advice before relying on it.