Future Homes Standard starts 24 March 2027. Is your site caught? Check in 30 seconds →
Mon–Fri 9am–5pm02475 095700
Developer guide

SAP Calculations for Extensions

Most house extensions do not need a SAP calculation. You need one when the extension has more glass than Approved Document L allows, or when you want to trade a weaker part of the design against a better one. SAP calculations: From £95 + VAT. Guide price. Get a free quote for your project.

From £95 + VATGuide price. Free quote for your project
6-minute readPlain-English guide for developers
Reviewed November 2026Guidance for England
02475 095700Mon to Fri, 9am to 5pm
Do you need one?

Do I need a SAP calculation for my extension?

Usually not. Approved Document L gives three ways to show an extension meets the energy rules. You only need a SAP for the third.

01

Meet the standard figures

Build the new walls, roof, floor, windows and doors to the U-values in the table below, and keep the glazing inside the 25% limit. No calculation is needed.

02

Area-weighted U-value

Show that the extension as a whole loses no more heat than a standard extension of the same size and shape. A better roof or wall can make up for slightly more glass.

03

SAP calculation

Show that the whole house with your extension is no worse than the same house with a standard extension. This is the route for extensions with a lot of glass.

Building Control can still ask for a SAP if the drawings do not show clearly that the extension meets the standard figures.

Developer guide

The 25% glazing rule

Approved Document L says the total area of windows, roof windows, rooflights and doors in an extension should not be more than the sum of:

  • 25% of the extension’s floor area
  • The area of any windows and doors that the extension takes out or covers up, such as the old back door and kitchen window

Measure whole frames, not just the glass. Bi-fold and sliding doors, French doors, roof lanterns and rooflights all count.

Developer guide

A worked example

A 5m by 4m kitchen extension has a floor area of 20m². 25% of that is 5m². It covers up a kitchen window of 1.2m² and a back door of 1.8m², which adds 3m². The glazing allowed is 8m².

Design Glazing Result
3.6m wide bi-fold (2.1m high) and one 1m by 0.8m rooflight 8.4m² 0.4m² over: a SAP or area-weighted calculation is needed
3.2m wide bi-fold (2.1m high) and the same rooflight 7.5m² Inside the limit: no calculation needed for the glazing

If you are close to the limit, check again whenever the window sizes change.

Do you need one?

What U-values does an extension need?

These are the limits for new parts of an existing home in Approved Document L Volume 1. Lower is better.

Element Maximum U-value (W/m²K)
Roof 0.15
Walls 0.18
Floor 0.18
Windows and roof windows 1.4, or Window Energy Rating Band B
Rooflights 2.2
Doors more than 60% glazed 1.4, or Doorset Energy Rating Band C
Other doors 1.4, or Doorset Energy Rating Band B

Any new or extended heating, hot water or lighting in the extension also has to meet Approved Document L.

Not sure if your extension is over the limit?

Send us the plans and elevations with the window and door sizes. We will check where your design stands and tell you if you need a calculation.

How it works

How the SAP calculation works for an extension

We model your house twice. The first model is the house with your extension as designed. The second is the house with a notional extension of the same size and shape, built to the standard U-values with glazing at the 25% limit.

Your design passes if its primary energy, carbon emissions and fabric energy efficiency are no worse than the notional version. Where the make-up of the existing house is unknown, standard figures from the SAP method are used.

Because the whole house is modelled, improvements outside the extension can count too. These are the usual ways to make up the difference:

01

Better glazing

Triple glazing or doors and rooflights with a lower U-value than the limit

02

More insulation

In the extension roof, walls or floor

03

Upgrades to the house

Such as more loft insulation or a more efficient heating system

Getting a quote

What we need from you

01

Drawings

Plans and elevations of the house and the extension, with window, door and rooflight sizes

02

Construction

What the new walls, roof and floor are built from, or the U-values if your designer has them

03

Glazing

The window, door and rooflight specification, if chosen

04

The house now

The heating and hot water system, and anything you know about the existing walls, roof and insulation

Our report is set out for your Building Control body. If the design does not pass first time, we tell you what to change.

Developer guide

Conservatories, porches and loft conversions

A conservatory or porch is exempt from the energy rules if all of these apply: it is at ground level, its floor area is no more than 30m², its glazing meets Part K, the wall, door or window between it and the house is kept or replaced, and the home’s heating is not extended into it. If the dividing wall or doors are removed, or a radiator is added, it is treated as an extension and the 25% rule applies.

A loft conversion does not usually need a SAP. The new and upgraded roof, walls and floor just need to meet the U-values.

Developer guide

Will the 2027 changes affect my extension?

A new edition of Approved Document L takes effect on 24 March 2027. For extensions to existing homes, the 25% glazing limit, the three ways to comply and the U-values in the table above are unchanged in the 2026 edition. Your Building Control body will confirm which edition applies to your project.

For more on SAP for existing buildings, see our SAP calculations for conversions and extensions page, how much SAP calculations cost and do I need Building Control approval?

Your questions

Frequently asked questions

Do I need a SAP calculation for an extension?

Only if the extension has more glazing than the 25% limit allows and you use SAP to show it still complies, or if Building Control asks for one. If the new walls, roof, floor and windows meet the U-values and the glazing is inside the limit, no calculation is needed.

What is the 25% glazing rule for extensions?

The windows, roof windows, rooflights and doors in an extension should not add up to more than 25% of its floor area, plus the area of any windows and doors the extension removes or covers up.

Do rooflights and roof lanterns count towards the 25%?

Yes. Rooflights, roof windows and lanterns all count, as do glazed doors, bi-folds and sliding doors.

What if my extension is over the 25% limit?

You can make the glazing smaller, or keep your design and show it complies with an area-weighted U-value calculation or a SAP calculation. Better glazing, more insulation or upgrades to the house can make up the difference.

Does a conservatory need a SAP calculation?

Not if it is exempt: at ground level, no more than 30m², separated from the house by an outside-quality wall, door or window, and with no heating extended into it. Otherwise it is treated as an extension.

How much does a SAP calculation for an extension cost?

SAP calculations are From £95 + VAT. Guide price. Get a free quote for your project.

Does an extension need an EPC?

Not just because of the extension. An EPC is needed when a home is built, sold or let, and it stays valid for 10 years. If you sell or let later, a new EPC will take the extension into account. See our EPC page.

Get a Free Quote for Your Project

Send us the plans and elevations with the window and door sizes. We will check where your design stands and tell you if you need a calculation.

Last reviewed: November 2026. Based on Approved Document L Volume 1, 2021 edition incorporating 2023 amendments, and the 2026 edition, for England. Your Building Control body has the final say.

Not sure what else your project needs?Answer three questions and get the full checklist, then one quote for the lot.
Try the services finder
Call usGet a free quote