Cladding Remediation Deadlines and the New Bill
The government wants unsafe cladding fixed on blocks of 18 metres and over by the end of 2029, and on blocks of 11 to 18 metres by the end of 2031. A new Bill now going through Parliament would give building owners a legal duty to assess their external walls, put interim safety measures in place and fix any unsafe cladding, with fines and even prison for those who don’t. This guide explains who it covers, the deadlines it sets and what to do now.
The Building Safety (Remediation of Unsafe Cladding etc) Bill was introduced in the House of Commons on 14 October 2026. It had its second reading on 27 October 2026 and its committee stage began on 12 November 2026. It is not law yet, and its wording can still change, but the direction is clear: the people responsible for a block’s outer walls will have to prove the walls are safe, or make them safe.
The target dates
In July 2025 the government said new law would require landlords of buildings with unsafe cladding to finish the work by set dates. Those dates are the ones most people now work to.
| Building height | Target to finish remediation |
|---|---|
| 18 metres or more | End of 2029 |
| 11 to 18 metres | End of 2031 |
| Under 11 metres | No set date. Government funding is possible in exceptional cases |
The Bill as introduced does not write those years into the law itself. Instead it says work must be done as soon as reasonably practicable, and it sets fixed deadlines for the first two steps: getting the walls assessed and publishing a plan. Ministers can add more detail later by regulations.
Which buildings the Bill covers
Location
Buildings in England.
Homes
At least two homes in the building, so blocks of flats and mixed-use buildings with flats.
Height
At least 11 metres high, or at least five storeys.
Age
Finished before 28 June 2022, the date parts of the Building Safety Act 2022 came into force.
Separate blocks
A self-contained part of a building, such as a block that could be redeveloped on its own, is treated as its own building.
Who has to act
The duties fall on the “responsible entity”: whoever is required, by a lease or by law, to repair or maintain the external walls. That is usually the freeholder, landlord, right to manage company or management company named in the leases. Where more than one party is responsible for the same walls, they share the duty.
Send us the building address, its height and number of storeys, and any past fire risk assessment or wall reports, and we will arrange a free quote for a FRAEW.
The four new duties
Assess the walls
Have a suitable professional carry out a fire risk assessment of the external walls within 10 months of the duty starting. If the report recommends interim measures or remediation, send a copy to Homes England.
Keep people safe meanwhile
Put any interim measures the report recommends in place as soon as reasonably practicable, and keep them until the walls are fixed.
Fix the walls
Take each step needed to carry out the recommended remediation as soon as reasonably practicable.
Publish a plan
Within 13 months, prepare a remediation compliance plan with the measures, the works and the timetable. Put it on your website, display a notice in the building saying how to get a copy, and give a copy to each leaseholder.
The Bill says these duties start two months after it becomes law, so the 10 and 13 month clocks start then too. A building’s walls count as fixed when the fire risk is removed or reduced to a tolerable level that holds with the building fully occupied and no one on watch, so a waking watch alone does not count.
When an old assessment still counts
You may not need a new assessment if either of these applies:
A clean fire risk assessment
The building’s latest fire risk assessment carried out since 16 May 2022 finds no risk, or suspected risk, from the external walls and does not recommend a wall assessment.
A good enough earlier FRAEW
A wall assessment carried out after 16 May 2022, before the duty starts, that would have met the new standard.
The standard will be set by regulations and can point to a British Standards Institution standard. Today the standard for this work is PAS 9980:2026, which replaced the 2022 edition in September 2026, and government guidance already says FRAEWs should use it. Our external wall surveys page explains what a FRAEW report contains and the four risk ratings.
What happens if you don’t comply
| Failure | Penalty in the Bill as introduced |
|---|---|
| No assessment by the deadline | A crime, up to two years in prison or a fine. Or a penalty of up to £14,000 plus up to £500 a day |
| Interim measures or remediation not carried out | A crime, up to two years in prison or a fine. Or a penalty of up to £500,000 |
| No remediation compliance plan | A financial penalty |
Councils’ housing teams and fire and rescue authorities enforce the duties, and the Building Safety Regulator does so for higher-risk buildings. A reasonable excuse is a defence. If a building owner still fails to act, the Bill lets public bodies such as Homes England and councils apply to a tribunal for powers to carry out the work themselves.
What to do now
Check the height
Measure or confirm the height and number of storeys. That decides whether the building is in scope and which target date applies.
Read your fire risk assessment
Does it mention the external walls, combustible materials or a recommended FRAEW? If it is older than 16 May 2022, it will not count.
Gather what you have
Drawings, cladding and insulation details, past wall reports and any EWS1 form.
Book a FRAEW early
Every in-scope building with any doubt will need one in the same 10 months. If you plan to apply for Cladding Safety Scheme funding, the FRAEW needs to come from a firm on the scheme’s panel.
Tell leaseholders
The plan will have to be shared anyway. Early, plain updates save a lot of questions.
Frequently asked questions
Is the 2029 cladding deadline law?
Not yet. It is the government’s target for buildings of 18 metres and over, with the end of 2031 for buildings of 11 to 18 metres. The Bill that would enforce remediation was in its Commons committee stage in November 2026.
Does the Bill apply to buildings under 11 metres?
No. The duties cover buildings in England with at least two homes that are at least 11 metres high or have at least five storeys. Owners of lower blocks still need a fire risk assessment that covers the external walls.
Does it apply to new buildings?
No. It covers buildings finished before 28 June 2022. Newer buildings are covered by the Building Safety Act 2022 and the current building regulations.
Do leaseholders have to pay to fix unsafe cladding?
Under the Building Safety Act 2022, leaseholders with a qualifying lease in a building of at least 11 metres or five storeys cannot be charged through the service charge for removing or replacing unsafe cladding. Costs for other historic safety defects are capped. Get legal advice on your own lease.
Can I sell a flat in a building with cladding?
Yes, but a buyer’s lender may ask for an EWS1 form or a FRAEW, and a published remediation plan will help. Our external wall surveys page explains when lenders ask for an EWS1 form.
What is a remediation compliance plan?
A document setting out the interim safety measures, the remediation works and the timetable for a building. Under the Bill it must be on the owner’s website, signposted in the building and sent to each leaseholder.
Who can carry out the assessment?
The Bill says a suitable professional. Regulations will set the standard. In practice this is a FRAEW to PAS 9980 by a qualified fire engineer or assessor.
How much does a FRAEW cost?
It depends on the size of the building, how much information exists and whether opening-up work is needed. Send us the address and what you have for a free quote.
Get a Free Quote for Your Project
Send us the building address, its height and number of storeys, and any past fire risk assessment or wall reports, and we will arrange a free quote for a FRAEW.
Last reviewed: November 2026. Checked against the Building Safety (Remediation of Unsafe Cladding etc) Bill as introduced (Bill 155, 2026-27) and its progress on bills.parliament.uk, and the government’s July 2025 statement on GOV.UK. The Bill may change before it becomes law. General guidance for England only. Get project-specific advice before relying on it.