TM59 Overheating Assessment
A TM59 assessment uses a computer model to show how warm the rooms in new homes will get through the year. It is the detailed way to meet Part O on overheating, needed when the simplified method fails or does not suit the design. Send us your drawings for a free quote.
What Is a TM59 Assessment?
A TM59 assessment is a detailed overheating analysis for residential buildings. It uses dynamic thermal modelling to simulate how internal temperatures are likely to change throughout the year under defined weather, occupancy, ventilation and solar-gain conditions.
The assessment is commonly used where the simplified Part O method is unsuitable or where a project fails the simplified route. It provides a more detailed understanding of which rooms are at greatest risk and which design changes are most effective.
One Stop Consult coordinates TM59 assessments through experienced specialists who can model the proposed development, review the results and test practical mitigation measures before issuing the final report.
TM59 and the Building Regulations
Part O was introduced to reduce excessive internal temperatures in new residential buildings by limiting unwanted solar gains and providing an effective means of removing excess heat.
New Dwellings
New houses and flats may require evidence that the design limits overheating risk under the applicable Building Regulations.
Student Accommodation
New student residences can require assessment of bedrooms, studios and relevant communal areas.
Buildings Where People Sleep
Certain institutional and multi-use residential buildings can fall within the scope of Part O.
Live/Work Units
Buildings containing both residential accommodation and work space may require review where they fall within the relevant scope.
When Is a TM59 Assessment Required?
Dynamic thermal modelling is generally used where the simplified route cannot adequately demonstrate compliance.
Failure of the Simplified Method
Where the glazing, orientation or ventilation strategy falls outside the simplified limits, a detailed assessment may be required.
Complex Building Designs
Irregular layouts, mixed orientations, rooflights, large glazed areas and varied dwelling types can require more detailed modelling.
Single-Aspect Apartments
Flats with openings on only one elevation may have limited cross-ventilation and a higher risk of overheating.
Noise-Constrained Sites
Where external noise prevents windows being left open, the model may need to assess an alternative ventilation strategy.
Planning or Client Requirements
A TM59 report may be requested through planning, sustainability commitments, funding requirements or employer specifications.
Design Optimisation
Developers may commission modelling early to test different façade, glazing, shading and ventilation options before technical design.
What Is Included in the Dynamic Thermal Model?
The building is recreated within specialist simulation software so that room temperatures can be assessed over time rather than through a single fixed calculation.
The accuracy of the result depends on the quality of the architectural, construction and building-services information supplied.
Weather Data and Site Location
Overheating risk varies significantly by location. Dynamic modelling uses suitable weather data to represent external temperature, solar radiation and other climatic conditions affecting the development.
The project address, local exposure and urban context are therefore important inputs. A highly glazed scheme in a warmer or dense urban location may perform differently from the same design elsewhere.
How TM59 Results Are Assessed
The model tests internal temperatures against recognised overheating criteria for occupied rooms.
Living Spaces
Living rooms, kitchens and combined living spaces are assessed for the frequency and severity of elevated temperatures.
Bedrooms
Bedrooms receive particular attention because high night-time temperatures can affect sleep and occupant health.
Occupied Hours
The methodology considers the periods when spaces are expected to be occupied rather than treating every hour identically.
Representative Units
Larger schemes may be assessed through carefully selected dwellings and rooms that represent the highest-risk orientations and layouts.
The TM59 Pass Marks in Plain Words
For Part O, homes are tested against TM59 (2017), the version Approved Document O names. A naturally ventilated home has to pass both criterion A and criterion B.
Criterion A
Living rooms, kitchens and bedrooms. The room must not be 1°C or more above its comfort limit for more than 3% of occupied hours from May to September.
Criterion B
Bedrooms only. Between 10pm and 7am the room must not go above 26°C for more than 1% of the hours across the year. That is 32 hours, so 33 hours or more is a fail.
Mechanically Ventilated Homes
A fixed test applies instead. Rooms must not go above 26°C for more than 3% of occupied hours across the year.
Where a room fails, the model is used to test changes to shading, glass, window opening and ventilation.
The Extra Rules Part O Adds to TM59
For Building Regulations, the model must follow TM59 and the limits in Approved Document O. They stop a design passing on assumptions that would not work in a real home.
Windows in the Day
When a room is occupied between 8am and 11pm, windows start to open above 22°C and are fully open above 26°C.
Windows at Night
From 11pm to 8am, a window can only be modelled fully open if it is on the first floor or above, is not easily accessible, and the room is above 23°C at 11pm.
Ground Floor Rooms
When a ground floor or easily accessible room is empty, windows and patio doors count as open in the day only if that can be done securely. At night they count as closed.
Blinds, Curtains and Trees
Internal blinds, curtains and foliage all reduce solar gain, but none of them can be counted towards a pass.
Noise at Night
Windows are likely to stay closed at night if noise in the bedroom is above 40dB averaged over the 8 hours from 11pm to 7am, or above 55dB more than 10 times a night.
Air Conditioning Comes Last
Building Control must be shown that all practicable passive measures have been used first. Mechanical cooling is only for where Part O cannot be met using openings.
Not sure you need a full model? Compare the simplified method and TM59, or see our Overheating Assessment service.
TM59:2026: What Has Changed
CIBSE published an updated method, TM59:2026, in July 2026. It has a new bedroom test based on overnight temperatures, weather files that look ahead to the 2050s, and a three-stage order: passive design first, then real-world limits such as noise and security, and cooling only as a last resort.
For Building Regulations, nothing has changed yet. Approved Document O (2021 edition, in force since 15 June 2022) still names TM59 (2017), and CIBSE says the 2017 version is still required for Part O. CIBSE recommends the 2026 version as best practice. Our TM59:2026 guide explains each change.
What Can Cause a TM59 Failure?
Failures are often caused by a combination of high solar gains and insufficient heat removal.
Excessive Glazing
Large windows can create substantial solar gains, particularly on south- and west-facing façades.
Limited Window Opening
Small openable areas, restrictors, security requirements or façade design can reduce natural ventilation.
Lack of Cross-Ventilation
Single-aspect rooms can struggle to achieve the airflow available to dual-aspect dwellings.
High Internal Gains
Occupants, appliances, lighting and communal systems can add heat throughout the day and evening.
Top-Floor Exposure
Roof-level rooms and units beneath rooflights may be exposed to additional solar gain.
Acoustic Constraints
A strategy that relies on open windows may be unsuitable where the external environment is too noisy.
How Can a TM59 Failure Be Resolved?
Dynamic modelling allows mitigation measures to be tested before they are committed to the final design.
Review Glazing Areas
Reduce or redistribute glazing where solar gain is excessive in relation to daylight and façade requirements.
Add External Shading
Balconies, fins, overhangs, shutters or other external measures can intercept solar radiation before it enters the building.
Use Solar-Control Glass
A revised glazing specification may reduce solar transmission while maintaining daylight and appearance.
Increase Openable Area
Larger or better-positioned openings can improve purge ventilation and increase airflow through occupied rooms.
Improve Mechanical Ventilation
Mechanical ventilation may support heat removal where natural ventilation is insufficient or constrained.
Coordinate MVHR Summer Bypass
Where MVHR is proposed, the summer-bypass arrangement should be properly considered so heat is not unnecessarily recovered.
TM59 Assessments on Noise-Constrained Sites
External noise can have a direct effect on the overheating strategy. A dwelling may technically pass when windows are assumed to remain open, but that may not represent a practical solution beside a busy road, railway, airport or commercial use.
The acoustic and overheating strategies should therefore be reviewed together. Where open windows are unsuitable, alternative ventilation or cooling measures may need to be modelled.
How the TM59 Assessment Process Works
Early modelling gives the design team more opportunity to resolve risk through proportionate changes rather than expensive late-stage redesign.
Project Review
Confirm the scope, building type, location and available technical information.
Model Setup
Recreate the relevant dwelling geometry, fabric, glazing and ventilation strategy in the simulation software.
Thermal Simulation
Run the model using the selected weather, occupancy and operating assumptions.
Design Review
Identify failures and test practical changes to glazing, shading or ventilation.
Final Report
Issue the completed assessment for the design team, client and Building Control.
Information Required for a Quotation
Provide the full project address, number and type of dwellings, current project stage and the latest architectural drawings.
Please also send available information on glazing, shading, window openings, construction build-ups, ventilation, occupancy assumptions and any acoustic or planning constraints affecting the design.
TM59 Assessments for Residential Developments
Nationwide TM59 Assessment Service
One Stop Consult coordinates TM59 dynamic thermal modelling for residential projects throughout mainland UK. Support is available for individual dwellings, apartment schemes, student residences, care facilities and larger multi-unit developments.
Other Services Your Project May Require
Important TM59 Assessment Information
The applicable assessment route depends on the building type, design, location, Building Regulations requirements and available project information. Dynamic thermal modelling relies on defined assumptions for occupancy, ventilation, weather and building operation. Changes to the glazing, façade, ventilation strategy or room layouts may affect the result and require the model to be updated. One Stop Consult provides consultancy and coordination support through its specialist assessor network.
TM59 Assessment FAQs
What is TM59?
TM59 is a recognised methodology for assessing overheating risk in homes using dynamic thermal modelling and defined criteria.
Is TM59 the same as Part O?
No. Part O is a Building Regulations requirement. TM59 is a dynamic modelling methodology that can be used within the detailed compliance route.
When is a TM59 assessment needed?
It is commonly required where the simplified Part O method is unsuitable or fails, or where detailed modelling is requested.
What buildings can be assessed?
TM59 is primarily used for residential developments such as houses, flats, student accommodation and similar sleeping accommodation.
What happens if the model fails?
The assessor can test mitigation measures such as reduced glazing, shading, solar-control glass, increased openable area or revised mechanical ventilation.
Can external noise affect the result?
Yes. Where windows cannot reasonably remain open because of noise, the model may need to use a different ventilation strategy.
When should TM59 modelling be completed?
It should be completed as early as possible, before glazing, façade and ventilation choices become difficult to change.
What information is required?
The assessor normally needs the architectural drawings, glazing data, window-opening details, fabric specification and ventilation strategy.
Do you provide TM59 assessments nationwide?
Yes. We coordinate suitable specialists for eligible projects throughout mainland UK.
What are TM59 criterion A and criterion B?
Criterion A checks that living rooms, kitchens and bedrooms are not too warm for more than 3% of occupied hours from May to September. Criterion B checks that bedrooms are above 26°C for no more than 1% of night-time hours across the year, which is 32 hours. Naturally ventilated homes must meet both.
Do I need TM59:2026 or TM59 (2017)?
For Part O sign-off, TM59 (2017) is still the version required. TM59:2026 is the newer CIBSE method, which CIBSE recommends as best practice, and planning, funders or clients may ask for it.
Do conversions need a TM59 assessment?
Not for Part O. Approved Document O applies to new residential buildings only. A planning condition, funder or client may still ask for one on a conversion.
Do blinds count in a TM59 assessment?
No. For Part O, internal blinds, curtains and foliage cannot be counted towards a pass. External shading, such as shutters and overhangs, can be.
Can air conditioning be used to pass TM59?
Only as a last resort. Approved Document O expects all practicable passive measures to be used first, and mechanical cooling only where the requirement cannot be met using openings.
Is TM59 mandatory?
Not on every project. Part O lets new homes show compliance either with the simplified method or with dynamic thermal modelling to CIBSE TM59. You need TM59 when the simplified method cannot be met or does not suit the design, and some councils ask for it at planning stage too.
What is the difference between TM59 and TM52?
TM52 is the CIBSE method for judging overheating in buildings that are not homes, such as offices and schools. TM59 was written for homes and is based on the TM52 approach, with an added test for bedrooms at night. For new homes under Part O, TM59 is the method to use.
What is an Overheating Assessment?
A check that a new home will not get too hot in summer. Part O of the Building Regulations has asked for one on new homes and other new residential buildings in England since June 2022. There are two ways to do it: the simplified method, which sets limits on glazing and minimum opening areas for windows, or dynamic thermal modelling to CIBSE TM59. Our Overheating Assessment page covers both routes.
Do London developments need a TM59 assessment?
Often, yes. The London Plan (Policy SI 4) asks major developments to show in their energy strategy how they will limit overheating and reliance on air conditioning, following its cooling hierarchy. It names TM59 as the method for homes and TM52 for non-domestic buildings. So a major housing scheme in London usually needs TM59 modelling at planning stage, as well as meeting Part O for Building Control. Smaller schemes are not held to the same policy, but the council can still ask for an assessment, so check your planning conditions. We can run the modelling alongside your London Plan energy statement, so both use the same model.
Request Your Free TM59 Assessment Quote
Complete the form below with the project address, number of dwellings and current design stage. Upload the latest plans, elevations, sections, glazing information and ventilation strategy so our team can review the requirement and coordinate an appropriate quotation.
Our work
TM59 Overheating Assessment projects we've delivered
Often booked together
Bundle TM59 Overheating Assessment with
One quote, one point of contact and a bundle discount when you book more than one service.