Main St

Swadlincote

Two two-storey, three-bedroom detached houses on Main Street in Swadlincote, completed in November 2016.

Main St, Swadlincote - project photo 1
Scheme
Two detached houses
Type
New build
Services
4
Status
Complete 2016

About the project

This job on Main Street in Swadlincote was two two-storey, three-bedroom detached houses, with a build cost of £270k.

We carried out a Phase 1 Desk Study to identify potential environmental hazards, provided Building Control and the building testing and compliance services, and issued the 10 Year Structural Warranty.

Construction began in November 2015 and ran over a 52-week contract, working closely with the contractor, with completion in November 2016.

On site

The build, stage by stage

  1. Main St, Swadlincote - Groundworks

    Nov 2015

    Groundworks

    Construction began with groundworks across the plot.

  2. Main St, Swadlincote - Walls

    Stage 2

    Walls

    Brick and blockwork went up under scaffold.

  3. Main St, Swadlincote - First fix

    Stage 3

    First fix

    Internal studwork went in ahead of plastering.

  4. Main St, Swadlincote - Finishes

    Stage 4

    Finishes

    Kitchens and internal finishes were fitted.

  5. Main St, Swadlincote - Complete

    Nov 2016

    Complete

    Both houses were completed at the end of the 52-week contract.

Photos from site

One point of contact

Where we fitted in

Before site

Design, calculations and surveys

  • Phase 1 Desk Study

During the build

Approvals, cover and materials

  • Building Control
  • Building Testing & Compliance Services
  • 10 Year Structural Warranty
Call usGet a free quote