The Copperworks

Camden Street, Birmingham

A 117-home mix of new build and conversion in Birmingham's Jewellery Quarter, built in phases within conservation-area rules.

The Copperworks, Camden Street, Birmingham - project photo 1
Scheme
117-home mixed development
Type
New build
Status
Complete

About the project

The Copperworks sits in the south west of Birmingham's Jewellery Quarter, a few minutes' walk from the city centre. It is a community of 117 homes across two phases, with apartments, duplexes and two and three storey townhouses.

Some homes are new build and others are conversions of the old industrial buildings. Everything had to work within the strict conservation-area guidelines that protect the heritage of the Quarter, so new brickwork sits alongside retained walls and original timber floors.

Our photographs follow phase 1 from the first reinforced foundations through scaffolded brickwork, new roofs and metal stud fit-out to finished apartments with exposed brick feature walls.

On site

The build, stage by stage

  1. The Copperworks, Camden Street, Birmingham - Foundations

    Stage 1

    Foundations

    Reinforcement and shuttering went in across the red sandstone ground ahead of the concrete.

  2. The Copperworks, Camden Street, Birmingham - Walls

    Stage 2

    Walls

    Brickwork and blockwork rose under full scaffold alongside the retained industrial buildings.

  3. The Copperworks, Camden Street, Birmingham - Roof

    Stage 3

    Roof

    New timber roof structures went on and slate covered the finished slopes.

  4. The Copperworks, Camden Street, Birmingham - First fix

    Stage 4

    First fix

    Metal stud partitions and services were set out inside the shell.

  5. The Copperworks, Camden Street, Birmingham - Finishes

    Stage 5

    Finishes

    Kitchens, oak doors and flooring completed the apartments.

  6. The Copperworks, Camden Street, Birmingham - Complete

    Stage 6

    Complete

    The scaffold came down to show new brickwork matched to the Jewellery Quarter setting.