About the project
Longford Mews is a development of three new homes at Cambridge House in Hampton Hill, with allocated parking and private gardens.
We assisted the client with Building Control, design SAP calculations and a pre-commencement energy statement, working to strict emissions targets with a minimum 35% reduction. We looked at the specification and cost engineered the best outcome.
In-roof solar panels proved the most cost-effective way to achieve Part L compliance, so we supplied and installed them. We also carried out the combined ventilation, air and sound testing.