About the project
This scheme on land off Halls Crescent in Sharnford is two pairs of semi-detached dormer bungalows, with access, parking, amenity space and a detached double garage.
We are providing the full compliance package: building control, a 10 year structural warranty, the Phase 1 desk study and structural engineering, along with SAP calculations, an overheating assessment and EPCs. Air tightness, sound insulation and ventilation testing are also part of our service.
The bungalows sit on piled foundations. By July 2025 piling was complete and ring beam reinforcement was going in with void formers, and substructure blockwork followed in August. Brick and blockwork reached dpc by December 2025. At our September 2026 visit the roofs were being felted and battened ready for tiling.