About the project
This Camden Street scheme is a mix of one and two bedroom apartments with studies, running from the ground floor to the third floor. The design is part conversion and part new build.
The finish is what sets it apart. Solid concrete floors sit alongside locally crafted brass fixtures and marine lighting, and each apartment has a zinc-clad kitchen.
Construction started in November 2016 and finished in November 2017, a 52-week build with costs of more than £1 million.