About the project
A repeat client came to us for a steel beam design at Bromley Hall in Kings Bromley, Staffordshire, so that an internal wall could be removed.
We quoted within 24 hours of the enquiry. Once instructed, our structural engineer completed the design and calculations within 7 working days, which let the client order the steel without holding up the job. The reports were issued by email as PDFs.