Project

Birmingham Road

Lichfield

A two storey, four bedroom detached house on Birmingham Road, Lichfield, built on a block and beam floor.

Birmingham Road, Lichfield - Four bedroom detached house
Scheme
Four bedroom detached house
Type
New build
Site inspections
4
Services
11
Status
Complete 2023

About the project

This is a single new house on Birmingham Road in Lichfield: a two storey, four bedroom detached home.

We handled the compliance package from start to finish. That covered building control, a 10 year structural warranty and the Phase 1 desk study, plus SAP calculations, an overheating assessment, water calculations and EPCs. Air tightness and ventilation testing, solar PV and cavity wall insulation completed the list.

Foundations went in during January 2023, 0.6m wide and up to 1.5m deep through sand onto sandstone, which gave good bearing. By February the substructure blockwork was done and the block and beam floor was in, with a 300mm void beneath and a 150mm cavity formed. From there the house went through first fix to a finished kitchen, insulated loft and completed external works.

On site

The build, stage by stage

  1. Birmingham Road, Lichfield - Foundations

    Jan 2023

    Foundations

    Foundations 0.6m wide were dug 1.0m to 1.5m deep, through sand down onto sandstone.

  2. Birmingham Road, Lichfield - Floors

    Feb 2023

    Floors

    Substructure blockwork was finished and the block and beam floor laid over a 300mm void.

  3. Birmingham Road, Lichfield - First fix

    Stage 3

    First fix

    First fix electrics and plumbing were completed.

  4. Birmingham Road, Lichfield - Complete

    Stage 4

    Complete

    All internal and external works were completed, with the kitchen fitted and the loft insulated.

Photos from site

One point of contact

Where we fitted in

Before site

Design, calculations and surveys

  • Phase 1 Desk Study
  • SAP Calculations (New Build)
  • Overheating Assessment
  • Water Efficiency Calculations

During the build

Approvals, cover and materials

  • Building Control
  • 10 Year Structural Warranty
  • Solar PV
  • Cavity Wall Insulation

At sign-off

Testing and certificates

  • Energy Performance Certificates
  • Air Tightness Testing
  • Ventilation Testing