Project

Dordon Road

Dordon

Two two-bedroom detached bungalows on Dordon Road in Dordon, near Tamworth.

Dordon Road, Dordon - Two detached bungalows
Scheme
Two detached bungalows
Type
New build
Site inspections
13
Services
10
Status
Complete 2024

About the project

This job was two two-bedroom detached bungalows on Dordon Road in Dordon, near Tamworth. Both have red brick walls, grey tiled roofs and a big glazed gable to the rear.

We coordinated the whole compliance package: Building Control, the 10 Year Structural Warranty, a Phase 1 Desk Study and the beam and block flooring, along with SAP calculations, overheating assessment, water efficiency calculations, air tightness and ventilation testing and EPCs.

Foundations went down to the structural engineer's design in low shrinkable clay, reaching 2.1m at the garage elevations. Block and beam floors followed in November 2023, trusses were up by February 2024, and by September 2024 the internal works were done and the foul drainage test had been witnessed.

On site

The build, stage by stage

  1. Dordon Road, Dordon - Foundations

    Nov 2023

    Foundations

    Foundations were excavated to the structural engineer's design, up to 2.1m deep at the garage elevations, with trenchblocks taking the substructure up.

  2. Dordon Road, Dordon - Floors

    Nov 2023

    Floors

    Reinforced beams went onto the damp proof course to form the block and beam floors, with 150mm of insulation.

  3. Dordon Road, Dordon - Walls

    Stage 3

    Walls

    Facing brickwork and blockwork went up on both bungalows.

  4. Dordon Road, Dordon - Roof

    Feb 2024

    Roof

    Roof trusses were erected to the manufacturer's design, with wind bracing and restraint straps fixed.

  5. Dordon Road, Dordon - Finishes

    Sep 2024

    Finishes

    Internal works were completed and the windows were in.

  6. Dordon Road, Dordon - Complete

    Sep 2024

    Complete

    The foul drainage test was witnessed, leaving only the driveway topping to finish.

One point of contact

Where we fitted in

Before site

Design, calculations and surveys

  • Phase 1 Desk Study
  • Water Efficiency Calculations
  • SAP Calculations (New Build)
  • Overheating Assessment

During the build

Approvals, cover and materials

  • 10 Year Structural Warranty
  • Building Control
  • Beam & Block Flooring

At sign-off

Testing and certificates

  • Air Tightness Testing
  • Ventilation Testing
  • Energy Performance Certificates