Future Homes Standard starts 24 March 2027. Is your site caught? Check in 30 seconds →
Mon–Fri 9am–5pm02475 095700
Part F Airflow Testing and Commissioning

Extract Fan and Ventilation Testing

Delivered 140+ times since 2018

An extract fan test measures the airflow from the fans or ventilation system in a new home against the Part F rates. Every newly created home needs one. From £45 + VAT (per plot, on the same visit as other testing). Guide price. Get a free quote for your project.

Part F Testing Airflow validation for new dwellings
Calibrated Equipment Testing with suitable calibrated instruments
System Commissioning Confirming extract rates and setup
Nationwide Coverage New builds and residential conversions

Ventilation Testing for New Dwellings

New-build residential developments and conversion projects that create new dwellings commonly require ventilation testing before completion. The purpose of the test is to confirm that the installed system delivers the intended airflow and has been configured correctly.

Ventilation systems can range from simple background ventilators and intermittent extract fans through to whole-house mechanical extract and heat-recovery systems. The testing method depends on the system installed and the rooms served.

One Stop Consult coordinates extract ventilation testing through experienced technicians using suitable calibrated equipment. The results can support project completion and the information required by the relevant Building Control body.

Building Regulations

Why Is Extract Ventilation Testing Required?

Testing confirms that the installed ventilation system performs as intended rather than relying solely on product specifications.

Airflow Validation

The measured extract rate confirms whether the fan or whole-house system is moving the required amount of air.

Correct Configuration

Testing can identify systems that have been left on the wrong setting or have not been balanced correctly.

Moisture Control

Adequate extraction helps remove moisture generated in kitchens, bathrooms and utility rooms.

Project Completion

Ventilation test information may be required as part of the completion package for Building Control.

Ventilation Systems

Systems That May Require Testing

We test the common ventilation types, from intermittent fans to whole-house mechanical systems.

Background Ventilation

Trickle ventilators and other background openings provide continuous low-level ventilation alongside extract provision.

Intermittent Extract Fans

Individual fans operate when required in wet rooms such as kitchens, bathrooms and utility rooms.

Continuous Mechanical Extract

A whole-house system extracts continuously from wet rooms and may operate at different normal and boost rates.

Mechanical Ventilation With Heat Recovery

MVHR systems extract stale air and supply fresh air while recovering heat through a central unit.

Centralised Systems

Multi-room or multi-unit arrangements may require balancing and commissioning across several terminals.

Mixed Ventilation Strategies

Some projects use a combination of background, intermittent and continuous ventilation measures.

Part F Figures

Extract Rates You Need to Hit (Part F)

Approved Document F sets the minimum airflow for each wet room. The technician measures each fan and compares it with these figures.

RoomFan that runs when needed (intermittent)Fan that runs all the time (continuous, high rate)
Kitchen with a cooker hood that extracts outside30 litres a second13 litres a second
Kitchen with no cooker hood, or a hood that does not extract outside60 litres a second13 litres a second
Utility room30 litres a second8 litres a second
Bathroom or shower room15 litres a second8 litres a second
Toilet (sanitary accommodation)6 litres a second6 litres a second

Continuous systems also run at a lower everyday rate, set so the home reaches its whole-dwelling rate. A toilet can use purge ventilation instead of an extract fan. These figures are from Approved Document F Volume 1, 2021 edition. The 2026 edition, which takes effect on 24 March 2027 for most work, keeps the same rates.

Whole-Dwelling Ventilation Rates

As well as the room-by-room extract rates, the home must reach an overall ventilation rate. Approved Document F sets a minimum by the number of bedrooms, and the home must also reach at least 0.3 litres a second for each square metre of internal floor area.

The bedroom minimums are 19 litres a second for one bedroom, 25 for two, 31 for three, 37 for four and 43 for five, plus 6 for each extra bedroom. A home with only one habitable room needs 13 litres a second. Your designer's figure is the one we test against.

Regulation 42: Results to Building Control Within 5 Days

When a new home is created, the airflow results must be given to Building Control no later than five days after the final test. The owner must also get information on the system and its upkeep within five days of the work finishing, and should be given a copy of the commissioning sheet.

The five days is the legal deadline in Regulation 42 of the Building Regulations, counted from the final test. It is not a turnaround time for the test or the paperwork. We record the results for your completion package, so they are ready to send on.

Test Paperwork

What Your Ventilation Test Certificate Shows

Approved Document F sets out how fans should be measured and what must be written down. The record is a commissioning sheet, often called a ventilation test certificate or extractor fan test certificate.

What Is Tested

The air flow of all mechanical ventilation fans, including intermittent extract fans, cooker hoods, and continuous fans and terminals.

How It Is Measured

With a calibrated air flow device and hood, accurate to 5% and calibrated in the last 12 months at a UKAS-accredited centre. Background ventilators stay open, and doors and windows stay closed.

What Is Recorded

The air flow at each fan or terminal, in litres a second, on the commissioning sheet set out in Appendix C of Approved Document F.

Who Gets a Copy

Building Control is given notice of the measured rates, and the owner should be given a copy of the completed commissioning sheet.

Part F Commissioning

Extractor Fan Testing and Part F Commissioning

Extractor fan testing, flow rate testing and ventilation commissioning are often used to mean the same thing. The Building Regulations treat them as two separate duties, and a new home needs both.

Flow Rate Testing

Regulation 42 applies when building work creates a new dwelling. The air flow at every fan or terminal is measured, and notice of the results goes to Building Control no later than five days after the final test.

Commissioning

Fixed mechanical ventilation in a new or an existing home must be commissioned so it works as intended, and Building Control must be given a commissioning notice.

Continuous Systems

For dMEV, MEV and MVHR, the commissioning sheet records both rates: the high rate, often called boost, for each wet room, and the continuous rate, often called trickle. Both must be met.

Cooker Hoods

Approved Document F says only the highest setting of a cooker hood needs to be recorded. A hood that extracts outside needs 30 litres a second.

Fan testing is done at the end of the build, so it can often be booked on the same visit as the air tightness test. From £45 + VAT (per plot, on the same visit as other testing). Guide price. Get a free quote for your project.

How Extract Ventilation Testing Works

The technician measures airflow at the relevant terminals and checks the system settings against the required design performance.

Review the installed ventilation system and room terminals.
Confirm normal, boost or intermittent operating modes.
Measure airflow using suitable calibrated equipment.
Compare measured results with the required extract rates.
Adjust or balance the system where this forms part of the service.
Record the final commissioning and test information.
1

System Review

Confirm the ventilation type, fan locations and required design rates.

2

Operational Check

Check that fans and controls are functioning and accessible.

3

Airflow Measurement

Measure extract performance at each required terminal.

4

Balancing or Adjustment

Where applicable, adjust system settings to improve performance and balance.

5

Final Documentation

Record the measured results for the project completion package.

Preparing for the Ventilation Test

The system should be fully installed, powered and operational before the technician attends. Incomplete grilles, ductwork, controls or electrical connections can prevent meaningful testing.

Good access to all relevant rooms and terminals will help the appointment proceed efficiently.

All fans installed and operational
Ductwork complete and connected
Grilles and valves fitted
Controls and boost switches working
Electrical power available
Access to all wet rooms provided
Design rates or schedule available
MVHR filters and terminals accessible
Common Problems

Why Ventilation Systems Fail Testing

Low airflow is often caused by installation, commissioning or ductwork issues rather than the fan unit alone.

Incorrect Fan Setting

The unit may have been left on a low commissioning setting or may not be entering boost mode correctly.

Restricted Ductwork

Long, crushed, undersized or excessively flexible duct runs can significantly reduce airflow.

Too Many Bends

Sharp bends and poor routing increase resistance and reduce the volume of air delivered.

Unbalanced Terminals

One outlet may receive too much airflow while other rooms remain below their required rate.

Blocked or Closed Valves

Terminals, grilles, dampers or filters may be restricted, incorrectly adjusted or obstructed.

Missing Background Ventilation

Extract performance and overall ventilation can be affected where the intended air inlets have not been installed or opened.

What Happens If the System Does Not Achieve the Required Airflow?

The cause should be investigated before the system is retested. Straightforward issues may include incorrect settings, closed valves or incomplete controls. More significant failures may require changes to the ductwork, fan specification or system layout.

Early commissioning is beneficial because access to ductwork and controls may become difficult once final finishes and boxing are complete.

Project Types

Extract Ventilation Testing for Residential Projects

Information Required for a Quotation

Provide the full project address, number and type of dwellings, installed ventilation system and preferred test date.

For larger developments, please also provide floor plans, the ventilation design or commissioning schedule, system manufacturer and confirmation of which plots require testing.

Nationwide Extract Ventilation Testing Service

One Stop Consult coordinates ventilation airflow testing for residential projects throughout mainland UK. Support is available for individual dwellings, conversion schemes, apartment developments and larger multi-plot sites.

Important Ventilation Testing Information

The applicable airflow requirements depend on the project, ventilation system, design specification and relevant version of Approved Document F. The system must be fully installed, powered and accessible on the agreed test date. Incomplete ductwork, controls, grilles or electrical connections may prevent testing or affect the result. Additional charges may apply for aborted visits, adjustment work or retesting. One Stop Consult provides consultancy and coordination support through its specialist testing network.

Frequently Asked Questions

Extract Ventilation Testing FAQs

Which projects require Ventilation Testing?

New residential buildings and conversion projects forming new dwellings commonly require airflow testing and commissioning.

What does the test measure?

It measures the airflow delivered or extracted at relevant ventilation terminals and compares this with the required design performance.

What equipment is used?

The technician uses suitable calibrated airflow-measurement equipment appropriate to the installed terminal and system.

Do intermittent fans need testing?

Yes. Approved Document F says the air flow of all mechanical ventilation fans should be tested, and that includes intermittent extract fans and cooker hoods.

Can you test MVHR and whole-house systems?

Yes. Whole-house mechanical extract and heat-recovery systems can require commissioning, balancing and recorded airflow results.

Why might a fan fail the airflow test?

Common causes include incorrect settings, restrictive ductwork, sharp bends, blocked terminals, poor balancing or an undersized system.

When should testing be completed?

Testing should take place once the system is complete and operational, with enough time remaining for adjustments or remedial work before handover.

What information is needed for a quote?

Provide the project address, number of dwellings, system type, plans or ventilation design where available, and preferred date.

Do you provide Ventilation Testing nationwide?

Yes. We coordinate suitable technicians for eligible projects throughout mainland UK.

What extract rate does a bathroom fan need?

15 litres a second for a fan that runs when needed, or a high rate of 8 litres a second for one that runs all the time.

How quickly must results reach Building Control?

For a new home, no later than five days after the final test. That is the deadline in Regulation 42 for giving Building Control notice of the results, not the time it takes to arrange the test.

How much does Ventilation Testing cost?

From £45 + VAT (per plot, on the same visit as other testing). Guide price. Get a free quote for your project. Other testing on the same visit can include Air Tightness Testing and sound insulation testing. See our Ventilation Testing price guide for what can add to the cost and how to pass first time.

Do I get a ventilation test certificate?

Yes. The measured air flow for each fan is recorded on a commissioning sheet, often called a ventilation test certificate, ready for your Building Control completion package.

Does a cooker hood need testing?

Yes, if it is part of the ventilation for the home. Approved Document F lists cooker hoods among the fans whose air flow should be tested.

How do I pass an extractor fan flow rate test?

Check each fan is set to the right speed for the room, keep the duct as short and straight as you can with as few bends as possible, and make sure flexible duct is pulled tight and not crushed. Check the outside grille or terminal is clear and fully open, and that any backdraught shutter moves freely. Book the test once the system is finished and running, with time left to adjust anything that falls short.

Can my electrician’s commissioning sheet be used instead?

Yes, if it meets Approved Document F. Each fan must be measured with a hooded air flow device that is accurate to 5% and was calibrated in the last 12 months at a UKAS-accredited centre, and the results must be recorded on a sheet with at least the information in Appendix C of Approved Document F. A sheet that only says the fans were fitted and switched on is not enough. Building Control decides whether to accept it.

Do cooker hoods need testing on the highest setting?

Yes. Approved Document F says that for cooker hoods only the highest setting needs to be recorded. A cooker hood that extracts outside needs at least 30 litres a second. Without one, the kitchen extract fan needs 60 litres a second.

Can it be done on the same visit as the air test?

Often, yes. Both tests are done when the home is finished, and the ventilation system must be complete and running for the fan test. Ventilation testing is From £45 + VAT (per plot, on the same visit as other testing). See our Air Tightness Testing page and ask for both on one quote.

Do conversions need fan testing?

Yes, if the conversion creates a new dwelling. Regulation 42 applies whenever building work creates a new dwelling, so the fans must be flow tested and the results sent to Building Control within five days of the final test. Where fans are fitted in an existing home, such as a new bathroom, Regulation 42 testing does not apply, although Part F still sets the extract rate the fan should reach.

What if the fan passes on boost but fails on trickle?

Then the system has not passed. A continuous system has to reach both rates: the high, or boost, rate in each wet room and the continuous, or trickle, rate, where all the terminals together must give at least the whole-home ventilation rate. The usual fixes are resetting the trickle speed, rebalancing the valves or terminals, or clearing a restriction in the duct. The fan is then tested again.

How is an extractor fan tested?

The tester holds a hooded air flow meter over each fan or extract terminal and measures how much air it moves, in litres a second. That figure is compared with the rate Approved Document F asks for in that room. The meter has to be accurate to 5% and calibrated in the last 12 months at a UKAS-accredited centre. The results go on a test sheet, which has to reach Building Control within five days of the final test.

Do you need an extractor fan by law?

In a new home, yes in practice. Part F of the Building Regulations requires adequate ventilation, and Approved Document F meets that with extract ventilation to outside from every kitchen, utility room and bathroom. A toilet needs an extract fan or an opening window. In an existing home the rule is narrower. When building work is carried out in a kitchen or bathroom, any fan already there, including a cooker hood that extracts to outside, should be kept or replaced. If the room had no fan before, Approved Document F says you do not have to add one, unless the work would leave the home’s ventilation worse than it was. A kitchen, bathroom or utility room added to an existing home does need extract ventilation.

Request Your Free Extract Ventilation Testing Quote

Complete the form below with the project address, number of dwellings, ventilation system type and preferred test date. Upload the latest plans, ventilation design or fan schedule so our team can review the requirement and coordinate an appropriate quotation.

Get Your Free Quote Today

Complete the form below and we'll provide a free, no-obligation quotation for your project.

Additional Services for Your Project (Optional)

Need more than one service? Select any additional services below and we'll include them in your quotation.





Not sure what else your project needs?Answer three questions and get the full checklist, then one quote for the lot.
Try the services finder
Call usGet a free quote