Part L Compliance for New Non-Domestic Buildings

SBEM Calculations for New Commercial Buildings

Delivered 20+ times since 2018

An SBEM calculation shows Building Control that a new commercial building meets Part L. It produces the BRUKL report you need before work starts and again at completion, and it leads to the final EPC. SBEM calculations are From £250 + VAT. Guide price. Get a free quote for your project.

Design-Stage SBEM BRUKL report before work starts
As-Built SBEM Final BRUKL report and EPC support
Specification Advice Practical routes to improve performance
Nationwide Service Commercial projects throughout the UK

What Is an SBEM Calculation?

SBEM stands for Simplified Building Energy Model. It is the government-approved tool for working out the energy use and carbon emissions of a new non-domestic building. The model covers the fabric, heating, cooling, hot water, ventilation, lighting and renewables, then compares the result with the Part L targets.

The process normally takes place in two stages. A design-stage SBEM is completed before construction, followed by an as-built assessment once the building has been completed and the final specification is known. Each stage produces a BRUKL report for Building Control.

One Stop Consult coordinates accredited commercial energy assessors who can complete the calculations, identify compliance shortfalls and advise on practical improvements to the proposed design.

Most buildings can be modelled in SBEM. Some designs need other approved software, known as dynamic simulation, and the assessor will confirm which is right. "L2A" is the older name for these rules, which now sit in Approved Document L Volume 2.

Building Regulations

When Are L2A SBEM Calculations Required?

SBEM calculations are generally required for newly constructed non-domestic buildings and many new commercial developments.

New Offices

Standalone offices and office accommodation within larger commercial developments.

Retail Buildings

Shops, retail parks, supermarkets, showrooms and customer-facing commercial premises. Built as a shell for a tenant? Our shell and core EPC guide explains the rules.

Industrial and Warehouse Units

Factories, workshops, warehouses, logistics units and distribution buildings.

Schools and Public Buildings

Education, healthcare, community and other publicly accessible non-domestic buildings.

Hotels and Leisure Buildings

Hotels, gyms, leisure centres, restaurants and similar commercial accommodation.

Mixed-Use Developments

Non-domestic areas within mixed-use schemes where separate SBEM assessment is required.

Assessment Stages

Design-Stage and As-Built SBEM Calculations

New non-domestic buildings are normally assessed at both design and completion stages.

Design-Stage SBEM

The proposed building is modelled before construction to establish whether the design is capable of satisfying the required energy and carbon targets.

Building Regulations Submission

The design-stage report provides Building Control with evidence of the intended Part L compliance strategy.

As-Built SBEM

The calculation is updated at completion using the final construction, systems, airtightness result and any design changes.

Final EPC

Once the as-built information is complete and the building achieves compliance, the final commercial EPC can be lodged.

BRUKL Reports

What Is a BRUKL Report?

BRUKL stands for Building Regulations UK Part L. It is the report the SBEM software produces, and it is what Building Control looks at to see whether your building meets Part L.

What It Shows

The target primary energy rate and target emission rate, your building's own figures, and the list of specifications behind them. Your building's figures must not exceed the targets. It also shows whether the walls, roof, glazing and building services meet the minimum standards.

Design-Stage BRUKL

Based on the drawings and specification. Building Control must have the figures no later than the day before work starts.

As-Built BRUKL

Updated with what was actually installed and the measured air test result. Building Control must have it no later than five days after completion. The energy assessor and the client both sign it. Higher-risk buildings follow a different process.

If the Build Changes

If anything changes during the build, such as the heating plant, glazing or lighting, the as-built result can change too. The software lists the differences from design stage, so tell us early and avoid surprises at completion.

Which One Do You Need?

SBEM, SAP and EPC: What Is the Difference?

These names are often mixed up. Here is what each one does.

SBEM

The calculation for non-domestic buildings. It shows the building meets Part L and produces the BRUKL report.

SAP

The same job for homes. See SAP calculations for new dwellings, or our guide to SAP or SBEM.

Commercial EPC

The energy certificate for the finished building. It is normally produced from the as-built SBEM, so one job leads to the other. See EPCs.

L2B SBEM

For work to existing non-domestic buildings, such as extensions and conversions. See L2B SBEM calculations.

Mixed-Use Schemes

The commercial space uses SBEM. New homes in the same building use SAP and also need an Overheating Assessment and a Part R Connectivity Plan.

Planning Conditions

Some planning permissions ask for energy information too. We can line this up with your SBEM when we discharge your planning conditions.

What Is Assessed in an SBEM Calculation?

SBEM models the predicted energy consumption and carbon performance of the building across its different activity zones.

Accurate architectural and building-services information is essential because occupancy patterns, lighting, heating, cooling and ventilation requirements can vary between areas.

Walls, floors and roofs
Windows, doors and rooflights
Building geometry and orientation
Heating and hot-water systems
Cooling and air conditioning
Mechanical and natural ventilation
Lighting and controls
Renewable-energy technologies

Building Zoning and Activity Areas

Commercial buildings are divided into zones based on their use, occupancy, conditioning and building-services arrangements. An office, meeting room, warehouse, kitchen and circulation space may each require different assumptions within the model.

Correct zoning is important because each area can have different heating, cooling, ventilation, lighting and occupancy profiles.

Clear room uses and coordinated mechanical and electrical layouts help the assessor create a more accurate and reliable model.

Compliance Results

How L2A SBEM Compliance Is Demonstrated

The proposed building is compared against a notional building created using the approved assessment methodology.

Building Emission Rate

The calculated carbon emissions of the building must not exceed the Target Emission Rate, at design stage and at completion.

Primary Energy

The building primary energy rate must not exceed the target primary energy rate, at design stage and at completion.

Fabric Performance

Each element must meet the limiting standards. Current maximum U-values include walls 0.26, flat roofs 0.18, pitched roofs 0.16, floors 0.18 and windows 1.6 W/m²K.

Building Services

Heating, cooling, ventilation, hot water, lighting and controls must meet relevant minimum-efficiency requirements.

Solar Gains

The design is reviewed for excessive solar gains and the effect of glazing, shading and cooling demand.

Consistency of Evidence

The calculation should reflect the drawings, specifications and products intended for construction.

Changes From 2027

The Future Buildings Standard: What Changes From 24 March 2027

New energy rules for new commercial and other non-domestic buildings in England come into force on 24 March 2027. Known as the Future Buildings Standard, they replace the current Part L requirements (Approved Document L Volume 2, 2021 edition).

Tighter Targets

A design that passes today may not pass under the new rules, so it is worth checking early.

Low Carbon Heating

New buildings are expected to use low carbon heating rather than fossil fuel boilers.

On-Site Renewables

On-site renewables, usually solar panels, will be expected on most new buildings.

Updated SBEM Software

The SBEM software and the notional building your design is compared with are being updated to match.

Building Fabric

Thermal Performance of the Building Envelope

The efficiency of the building fabric has a major influence on heating, cooling and overall energy demand.

External Walls

Wall build-ups, insulation thicknesses and U-values are modelled according to the proposed construction.

Ground and Exposed Floors

Floors are assessed according to their construction, perimeter and relationship with external or unheated spaces.

Roofs

Pitched, flat, metal-deck and other roof systems are included using their proposed thermal specification.

Glazing and Doors

U-values, solar performance, frame factors and areas of windows, curtain walling, rooflights and doors are assessed.

Thermal Bridging

Junction details and thermal-bridging assumptions influence heat loss through the building envelope.

Airtightness

The proposed design air-permeability target is included at design stage and replaced with the measured result at completion.

Building Services

Heating, Cooling, Ventilation and Lighting

Building services often have the greatest effect on commercial energy use and SBEM performance.

Heating Systems

Boilers, heat pumps, district systems and other heating plant are assessed using their efficiency and control arrangements.

Cooling Systems

Air-conditioning and comfort-cooling systems are modelled according to their performance, zoning and controls.

Ventilation

Natural ventilation, mechanical ventilation, heat recovery and fan energy are included within the assessment.

Hot Water

Water-heating systems, storage, distribution and controls are assessed where relevant to the building use.

Lighting

Installed lighting power, occupancy controls, daylight controls and display lighting can significantly affect the result.

Controls and Management

Time controls, zoning, sensors and building-management systems can improve efficiency when accurately specified.

Renewable and Low-Carbon Technologies

Renewable technologies can help reduce the calculated carbon and primary-energy performance of a new commercial building.

Solar photovoltaic panels are commonly included, while heat pumps, heat-recovery systems and other low-carbon measures may also support the wider compliance strategy.

The suitability of each measure depends on the building use, roof area, orientation, electrical demand, planning constraints and project budget.

Design Optimisation

What Happens If the Design Does Not Comply?

A failing result can often be improved through targeted changes rather than a complete redesign.

Improve the Building Fabric

Upgrade selected walls, floors, roofs, windows or doors to reduce heat loss.

Review Glazing and Solar Gain

Adjust glazing performance, shading or orientation to manage heat loss and cooling demand.

Upgrade Heating and Cooling

Specify more efficient plant, distribution systems and control strategies.

Improve Ventilation Efficiency

Reduce fan power, introduce heat recovery or refine the ventilation strategy where appropriate.

Improve Lighting Performance

Reduce lighting power and introduce effective occupancy and daylight controls.

Add Renewable Technology

Introduce or increase solar PV or other suitable low-carbon technologies.

How the L2A SBEM Process Works

The most efficient assessment process begins before construction, while the fabric and building-services specification can still be adjusted.

Review the architectural and building-services information.
Divide the building into appropriate activity zones.
Complete the design-stage SBEM model.
Identify any compliance shortfall or missing information.
Advise on practical specification improvements.
Update the model using final as-built information.
1

Design Review

Obtain the drawings, room uses, construction build-ups and proposed mechanical and electrical specification.

2

SBEM Modelling

Model the building geometry, zones, fabric and building services using approved software.

3

Compliance Review

Assess the proposed building against the applicable energy and carbon targets.

4

Design Advice

Recommend suitable fabric, services, controls or renewable improvements where required.

5

As-Built Assessment

Update the model using final information and support issue of the commercial EPC.

Information Required for a Quotation

Provide the full project address, proposed building use, floor area, current project stage and the latest architectural drawings.

Please also send any available construction specification, mechanical and electrical designs, lighting layouts, glazing information, ventilation strategy and renewable-energy proposals.

Completion Information

Information Needed for the As-Built SBEM

The final assessment must reflect the building as actually constructed and commissioned.

Final Construction Build-Ups

Confirmation of the materials, insulation and thicknesses installed within the walls, floors and roofs.

Air-Test Result

The measured air-permeability result for the completed building, where airtightness testing is required.

Heating and Cooling Plant

Manufacturer and model information for the systems, efficiencies and controls actually installed.

Ventilation Information

Final fan, air-handling, heat-recovery and commissioning details where applicable.

Lighting and Controls

Final lighting power, luminaire information, occupancy controls and daylight controls.

Renewable-Energy Details

Final capacity, orientation and product information for any solar PV or other low-carbon systems installed.

Project Types

L2A SBEM Calculations for a Range of Buildings

Assessments can be coordinated for small commercial units, major developments and complex multi-zone buildings.

Nationwide New-Build SBEM Calculation Service

One Stop Consult coordinates design-stage and as-built SBEM calculations for new non-domestic buildings throughout mainland UK. Assessments can be provided for individual commercial units, industrial buildings, offices, schools, retail developments and larger mixed-use schemes.

Complete Commercial Compliance Support

Other Services Your Project May Require

SBEM calculations are commonly coordinated alongside testing, certification and wider commercial-building services.

Important SBEM Calculation Information

SBEM compliance depends on the applicable Building Regulations, building use, zoning, construction specification, installed systems and evidence provided. The design-stage assessment should be completed before construction so that any required changes can be incorporated early. The as-built result may change where products, systems or construction details differ from the approved design. One Stop Consult provides consultancy and coordination support through its specialist accredited commercial energy-assessor network.

Frequently Asked Questions

L2A SBEM Calculation FAQs

How much does an SBEM calculation cost?

SBEM calculations are From £250 + VAT. Guide price. Get a free quote for your project. Our guide How much do SBEM calculations cost? explains what changes the price.

What does SBEM stand for?

Simplified Building Energy Model. It is the approved tool for working out the energy performance of non-domestic buildings for Part L and for commercial EPCs.

What is a BRUKL report?

It is the compliance report produced by the SBEM calculation. BRUKL stands for Building Regulations UK Part L. Building Control uses it to check that a commercial building meets Part L. You will usually need one at design stage and another once the building is finished. Our BRUKL report guide explains what it shows and what to do if it fails.

Are SBEM and an EPC the same thing?

No. The SBEM calculation shows the building meets Part L. The EPC is the energy certificate for the finished building. The commercial EPC is normally produced from the as-built SBEM, so one job leads to the other.

What is an L2A SBEM calculation?

It is an energy calculation that shows a new non-domestic building meets Part L. L2A is the older name for these rules, which now sit in Approved Document L Volume 2.

When should the design-stage SBEM be completed?

It should be completed before construction begins so the fabric, heating, cooling, ventilation and lighting specifications can be checked and amended where necessary.

What is the difference between design-stage and as-built SBEM?

The design-stage assessment models the proposed building. The as-built assessment is updated using the final construction, installed systems, airtightness result and any changes made during the works.

Which buildings need an SBEM calculation?

Most new non-domestic buildings do. Exemptions include places of worship, temporary buildings planned for two years or less, low energy demand industrial sites, workshops and non-residential agricultural buildings, and stand-alone buildings under 50 square metres.

What happens if the building fails the SBEM calculation?

The assessor can review the model and recommend targeted improvements to the fabric, glazing, heating, cooling, ventilation, lighting, controls or renewable-energy strategy.

Is an air test required for the as-built SBEM?

Yes, in most cases. New non-domestic buildings must be pressure tested and the result goes into the as-built calculation. The limit is 8 m³/(h·m²) at 50 Pa. Buildings under 500 square metres can avoid a test if the calculation assumes 15 m³/(h·m²).

Does the SBEM calculation include the EPC?

The commercial EPC can normally be produced after the as-built SBEM has been completed and all required final information has been received.

Can you help improve the commercial specification?

Yes. The model can be used to compare different fabric, building-services, lighting, controls and renewable-energy options to identify a practical route to compliance.

Do you provide new-build SBEM calculations nationwide?

Yes. We coordinate suitable accredited assessors for eligible non-domestic projects throughout mainland UK.

Do the new 2027 Part L rules affect my SBEM calculation?

Yes, if your project is submitted to Building Control on or after 24 March 2027, or if work does not start before 24 March 2028. The new rules are tighter and usually mean low carbon heating and solar panels. We can tell you which rules apply and run the design-stage SBEM against them.

When does Building Control need the SBEM?

The design-stage figures must reach Building Control no later than the day before work starts. The as-built figures must follow no later than five days after completion. Higher-risk buildings follow a different process.

Who can produce an SBEM calculation?

We use accredited commercial energy assessors. The as-built BRUKL report is signed by the energy assessor, and the commercial EPC must be lodged by an accredited assessor.

Do I need an SBEM for an extension or conversion?

That depends on the work. Existing non-domestic buildings are covered by L2B rather than L2A, so see our L2B SBEM calculations page or send us the details and we will tell you what applies.

What is the difference between SAP and SBEM?

SAP is used for new homes. SBEM is used for non-domestic buildings such as shops, offices and industrial units. On a mixed-use scheme you may need both: SBEM for the commercial space and SAP for the homes.

Is SBEM the same as a BRUKL report?

No. SBEM is the calculation. The BRUKL report is the document it produces for Building Control, at design stage and again as built.

What is the difference between an EPC and a BRUKL report?

A BRUKL report is a Building Regulations document. It shows Building Control that a new non-domestic building meets Part L, by comparing the carbon emission and primary energy rates of the building with the targets and checking the minimum standards for the fabric and building services. An EPC is the energy rating certificate (A+ to G) that the finished building must have, and it is lodged on the government register so it can be shown to buyers and tenants. Both come from the same SBEM model, so the as-built SBEM gives you the final BRUKL report and the EPC together. See our EPC page for more.

How is SBEM calculated?

The assessor splits the building into zones by use, such as office, warehouse or shop floor, and enters the walls, floors, roofs, glazing, heating, cooling, ventilation, hot water and lighting for each zone into approved software. The software applies standard occupancy and weather data from the National Calculation Method to work out the yearly energy use, carbon emissions and primary energy of the building. It then compares them with a notional building of the same size, shape and use. If the rates for your building are no higher than the targets, it passes, and the result is set out in the BRUKL report.

Request Your Free L2A SBEM Calculation Quote

Complete the form below with the project address, proposed building use, floor area and current design stage. Upload the latest plans, elevations, sections and any available construction, mechanical, electrical and lighting information so our team can review the project and coordinate an appropriate quotation.

Get Your Free Quote Today

Complete the form below and we'll provide a free, no-obligation quotation for your project.

Additional Services for Your Project (Optional)

Need more than one service? Select any additional services below and we'll include them in your quotation.





Not sure what else your project needs?Answer three questions and get the full checklist, then one quote for the lot.
Try the services finder
Call usGet a free quote