About the project
This job on Sir Harry's Road in Edgbaston added a two and single-storey rear extension to the house, with structural internal alterations and universal steel beams.
We provided Building Control. With steels going in and the structure of the existing house changing, the work needed checking at each stage for safety and compliance.
Foundations were dug in July 2023 in medium shrinkable clay, and the substructure reached damp proof course within days. By August the blockwork and brickwork were complete, with 90mm insulation in the cavity to meet the new U-values and a warm deck to the lower roof.