Project

Richard Cooper Road

Lichfield

A two storey, five bedroom oak and timber frame house on Richard Cooper Road, Shenstone, near Lichfield.

Richard Cooper Road, Lichfield - project photo 1
Scheme
Five bedroom detached house
Type
New build
Site inspections
6
Services
4
Status
Complete 2025

About the project

This is a single five bedroom detached house on Richard Cooper Road in Shenstone, near Lichfield. It is a two storey home built around a timber and oak frame, with a mix of render, brick and timber detail outside.

We provided building control, a 10 year structural warranty and a Phase 1 desk study, along with a connectivity plan for the new home.

Foundations went in during June 2024, with mesh reinforcement in sand and gravel, and the block and beam floor followed in July. The frame was up by October and the superstructure and leadwork finished by December. Kitchen and bathrooms were in by May 2025, and we carried out the final inspection in September 2025.

On site

The build, stage by stage

  1. Richard Cooper Road, Lichfield - Foundations

    Jun 2024

    Foundations

    Foundations 0.6m to 0.75m wide were dug to 1.2m in sand and gravel with mesh reinforcement.

  2. Richard Cooper Road, Lichfield - Floors

    Jul 2024

    Floors

    The block and beam floor went in over a 250mm void, with air bricks at 2m centres.

  3. Richard Cooper Road, Lichfield - Walls

    Oct 2024

    Walls

    The timber and oak frame was completed, bolted down at the sole plate.

  4. Richard Cooper Road, Lichfield - Roof

    Dec 2024

    Roof

    The superstructure was finished, with leadwork completed around the chimney details.

  5. Richard Cooper Road, Lichfield - Finishes

    May 2025

    Finishes

    All external works were done and the kitchen, tiling and bathrooms were in.

  6. Richard Cooper Road, Lichfield - Complete

    Sep 2025

    Complete

    The house passed its final inspection with all internal and external works complete.

One point of contact

Where we fitted in

Before site

Design, calculations and surveys

  • Phase 1 Desk Study
  • Connectivity Plan

During the build

Approvals, cover and materials

  • Building Control
  • 10 Year Structural Warranty
Call usGet a free quote