Coal Mining Reports and Risk Assessments
Building on former coal mining land? Most planning applications in a Development High Risk Area need a Coal Mining Risk Assessment (CMRA). Tell us about your site and we will quote for the right report.
Coal Mining Risk Assessments for Planning
Large parts of England, Wales and Scotland were mined for coal. Old shafts, shallow workings and mine gas can still lie under the ground, and new building work can set off subsidence or a collapse.
The Mining Remediation Authority, formerly the Coal Authority, maps the coalfield into a Development High Risk Area and a Development Low Risk Area. If your site is in the High Risk Area, the council will expect a Coal Mining Risk Assessment with most planning applications and will consult the Authority before it decides.
The assessment reviews the mining records and geology for your site, sets out the risks to your development, and explains how they will be dealt with, so the council can be satisfied the site is, or can be made, safe and stable.
When Is a Coal Mining Risk Assessment Needed?
It depends on where the site sits on the coalfield and on the type of application. These are the Mining Remediation Authority's rules.
Development High Risk Area
Most planning applications need a CMRA. This covers new homes, commercial buildings and other work with real groundworks.
Development Low Risk Area
No CMRA is needed. The land is still on the coalfield, so any mining feature found during the work must be reported straight away.
Householder Applications
Extensions and other householder applications are exempt, although the council or building control can still ask for one.
Changes of Use
A pure change of use with no groundworks, such as offices to homes, is exempt. New building work on the site is not.
Retrospective Applications
Applications to keep work already built still need written evidence that the mining risks were considered.
Light Structures
Fences, EV chargers, heat pumps and solar panels are exempt. Solar farm buildings or kiosks on deep foundations are not.
Coal Mining Report or Coal Mining Risk Assessment?
The names sound alike, but they do different jobs. Many applicants send a factual report with a planning application when a risk assessment is needed.
CON29M Coal Mining Report
The conveyancing search used when buying a property on the coalfield. It gives basic, factual information on recorded coal mining at the address. It does not assess the risk to new building work.
Consultants Coal Mining Report
A more detailed factual report of the mining records for a site. It is one of the sources a CMRA draws on, but on its own it gives no assessment of the risks to your scheme.
Coal Mining Risk Assessment
The report for a planning application. It assesses the risks to your proposed development, explains how they shaped the layout and sets out any further investigation and remedial work needed.
Why a Factual Report Is Not Enough for Planning
The Mining Remediation Authority says it will object to a planning application supported only by a factual report, such as a CON29M or a Consultants Coal Mining Report. These list what is recorded but do not assess the risk to the development. For planning in the High Risk Area you need a Coal Mining Risk Assessment.
What a Coal Mining Risk Assessment Includes
GOV.UK guidance sets out six parts. The council and the Mining Remediation Authority will look for each one.
Introduction
The site location with a plan and description, and the proposed development with its layout and application description.
Sources of Information
An up-to-date Consultants Coal Mining Report, mine abandonment plans, geology, historic maps and any earlier site investigations.
Site-Specific Risks
Each mining feature on or near the site, how features act together, and the risk they pose one by one and in total.
Mitigation Strategy
How the mining legacy has shaped the layout and design, with plans for mine entries and any further investigation needed.
Conclusion
A summary of the risks, the further investigations needed and the recommended remedial and mitigation work.
Appendices
The supporting data, especially anything used to rule a risk out, such as borehole records.
Coal Mining Risks the Assessment Looks At
Many of these features cannot be seen from the surface, and early mining often went unrecorded. Shallow workings are generally those within about 30 metres of the surface.
The assessment also looks at how features act together, such as the depth of solid rock above old workings.
How It Works
A CMRA is a desk-based study. It is best done before the layout is fixed, because mine entries can decide where you can build.
Send Your Details
The site address, a red line plan, your proposed layout and any council comments.
Free Quote
We confirm which report you need and send a quote to agree before any work starts.
Desk Review
The mining records, geology and site history are reviewed against your scheme.
Final Report
A final, signed report ready to go in with your planning application.
If the Risks Cannot Be Ruled Out
Where the desk study cannot rule a risk out, the assessment recommends further site investigation. If there is a mine entry on the site, the Mining Remediation Authority expects its exact position to be found on site, so the layout can keep buildings clear of it.
The Authority's policy is to avoid building over or close to a mine entry wherever possible, even once it has been capped. The council may then add planning conditions for the site investigation and any remedial work before building starts.
What to Send for a Quote
Send the full site address, a description of what you plan to build and your latest drawings, including the site layout.
Please also send the council's request, validation letter or pre-application advice, and any earlier ground reports, borehole records or coal mining reports for the site.
Councils on the Coalfield
Councils with land on the coalfield include Nuneaton and Bedworth, North Warwickshire, Coventry, North West Leicestershire, Barnsley, Sheffield, Bradford and Wigan. You can check your site on the Mining Remediation Authority's free online map, then confirm with the council.
Other Services Your Project May Require
Coal mining checks often sit alongside other ground, planning and design work.
Important Coal Mining Information
This page follows the GOV.UK guidance on coal mining risk assessments for planning applications, last updated on 28 September 2026. Whether you need a CMRA, and what it must cover, depends on your site, your scheme and your council, which can ask for any information it needs. If you come across a mining feature while working on site, report it straight away to the Mining Remediation Authority's 24-hour line on 0800 288 4242.
Coal Mining Risk Assessment FAQs
What is a Coal Mining Risk Assessment?
It is a desk-based report for a planning application on the coalfield. It reviews the mining records and geology for the site, assesses the risks to the proposed development and sets out how they will be dealt with, so the council can be satisfied the site is safe and stable.
Is a CON29M report the same as a Coal Mining Risk Assessment?
No. A CON29M is the conveyancing search used when buying property. It lists recorded mining information but does not assess the risk to new building work. The Mining Remediation Authority will object to a planning application supported only by a CON29M or another factual report.
How do I know if my site is in a Development High Risk Area?
The Mining Remediation Authority has a free interactive map that shows whether a site is likely to be in the High Risk Area. GOV.UK advises confirming it with your council, which holds the Authority's planning data. If you are not sure, send us the address.
Do I need a CMRA for a house extension?
Householder applications are exempt, so the Authority is not consulted on them. The council or building control can still ask for a CMRA if they think it is needed, and the homeowner is responsible for making sure the work is safe and stable.
What if my site is in the Development Low Risk Area?
There is no need for a CMRA. The land is still on the coalfield, so if any mining feature turns up during the work, report it straight away on the 24-hour line, 0800 288 4242.
Can a CMRA be left to a planning condition?
No. The Mining Remediation Authority says it should be sent in with the application, because it shows the site is suitable and can shape the layout. Conditions may then be used for the site investigation and remedial work it recommends.
Who can prepare a Coal Mining Risk Assessment?
GOV.UK guidance says a suitably qualified person who is competent in ground stability and mining hazards, with sign-off ideally by a chartered engineer or geologist. The authors should be named, and the report sent with the application must be the final signed version, not a draft.
What happens if the assessment finds a mine shaft?
The Authority expects the exact position of a mine entry to be found by investigation on site, and the layout to keep buildings off and away from it. Any drilling or work that disturbs or enters mine workings needs a Mining Remediation Authority permit first.
Do retrospective applications need a CMRA?
Yes. Even where the building is already up, the application should include written evidence from a competent person showing how the mining risks were considered during construction.
Is the Mining Remediation Authority the same as the Coal Authority?
Yes. The Coal Authority has traded as the Mining Remediation Authority since 28 November 2024. Its legal name is still the Coal Authority, and its role as a statutory consultee on planning applications has not changed.