Developer guide

Do I Need a Bat Survey?

You need a bat survey when there is a reasonable chance that bats use a building or trees your work will affect. That most often means work to a roof, a loft, a barn or an older building near trees or water. The first check can be done at any time of year, but the follow-up surveys only in the warmer months, so it pays to ask early.

Free quotesSend your drawings for a price
7-minute readPlain-English guide for developers
Reviewed November 2026Guidance for England
02475 095700Mon to Fri, 9am to 5pm
Developer guide

The short answer

01

Planning application

The council should ask for a bat survey if your work is likely to affect bats or the places they roost, feed or travel. As the applicant, you arrange and pay for it.

02

No planning permission needed

The law still protects bats. Roof repairs, re-roofing and loft work can all break it if bats are there, even when no council is involved.

03

Bats found

This rarely stops a job. The work may need to be timed or built in a certain way, and sometimes needs a licence first.

Do you need one?

When will the council ask for a bat survey?

Government advice tells councils to ask for a survey when bats are likely to be affected. These are the signs they look for:

01

Records

Bats have been recorded in the area before. A lack of records does not prove there are none.

02

The building

It is close to woodland, hedges or water, or has uneven roof tiles, cracks, small gaps, or hanging tiles or timber cladding on walls that face south.

03

The work

Building, demolition, an extension, a conversion, renovation or maintenance that could affect a roost.

04

Trees

Felling mature trees, or trees with holes, loose bark or thick ivy.

05

Lighting

New lighting on buildings or green space close to where bats live or feed.

Many councils put bat surveys on their planning checklist. If yours does and the survey is missing, the application may not be accepted until it arrives.

Do you need one?

Do I need a bat survey for my job?

These are the usual answers. The building and what is around it matter more than the type of job, so treat this as a guide and send us a photo if you are unsure.

Job Is a bat survey likely?
Loft conversion Often, on older houses. Lofts are common roosts, and the government lists converting or insulating a loft as work that can harm bats.
Re-roofing or repairs Possibly, even with no planning application. Re-roofing is on the government’s list of work that can harm bats, so get advice first if you know or suspect bats are there.
Extension Sometimes. More likely where the extension ties into the existing roof or eaves, or the house is near woodland or water.
Barn conversion Very often. Quiet, unlit barns and outbuildings with gaps and open roof timbers suit bats well, so expect the council to ask.
Demolition Very often. The whole building goes, so any roost goes with it. You will usually need an asbestos survey too.
Felling mature trees Sometimes. Trees with holes, splits, loose bark or thick ivy can hold roosts.
New house, empty plot Less often. With no buildings or mature trees to lose, the council is more likely to ask for a wider ecology survey.
Permitted development No council will ask, but the law still applies. You can still commit an offence if bats are harmed or a roost is damaged.
Developer guide

What the law says

All bat species in the UK, and the places they breed and rest, are protected by law. Government guidance lists these as offences:

01

Harming bats

Deliberately capturing, injuring or killing them.

02

Damaging a roost

Damaging or destroying a place where bats breed or rest.

03

Blocking a roost

Blocking the way in to a place where bats rest or shelter.

04

Disturbing bats

Deliberately or recklessly disturbing a bat while it is in its roost.

If you are found guilty, you could get an unlimited fine, up to six months in prison, or both. A survey before work starts is the simplest way to show you took care.

How it works

The two stages of a bat survey

01

Stage 1, the daytime check

An ecologist looks over the inside and outside of the building, including the loft, eaves and any outbuildings, for bats, droppings and gaps a bat could use. This can be done at any time of year. If there is next to no chance of bats, the report says so and that is the end of it.

02

Stage 2, dusk surveys

If signs of bats are found, or the ecologist cannot rule them out, surveyors watch the building at dusk or dawn to see whether bats come and go, how many and from where. These can only be done when bats are active, usually May to September, and may take more than one visit.

In the summer months, the daytime check and the first dusk survey can sometimes be done on the same day.

Do you need one?

When can bat surveys be done?

Survey When it can be done
Daytime check (stage 1) Any time of year
Dusk and dawn surveys (stage 2) Usually May to September, while bats are active

This is why timing matters. If the council asks for a survey in the autumn and the daytime check cannot rule bats out, the dusk surveys have to wait until the next spring. Ask for the daytime check as soon as you know the job involves a roof, a loft, a barn or mature trees.

Developer guide

What happens if bats are found?

The ecologist’s report sets out what was found, how the work would affect the bats and what to do about it. That can mean doing the work at a certain time of year, using certain materials, or keeping or replacing the roost.

If the work cannot avoid harming bats or their roost, you need a licence from Natural England before work starts. It is usually applied for once planning permission is granted. The council may also add planning conditions that tie the work to the bat report.

Your questions

Frequently asked questions

Do I need a bat survey for planning permission?

Only if the work is likely to affect bats. The council decides from the type of building, what is around it, local bat records and the work you plan. Barn conversions, demolition, and roof or loft work on older buildings are the usual cases.

Do I need a bat survey to replace my roof?

Re-roofing does not normally need planning permission, so no council will ask for one. The law still applies, though. If you know or suspect bats use the roof, get advice before work starts. For work on your own home with no planning application, the National Bat Helpline gives free advice.

Do I need a bat survey for a loft conversion?

If the loft conversion needs planning permission and the house is older or near trees or water, the council may ask for one. If it is permitted development, nobody will ask, but you must still not harm bats or damage a roost. See Do I need Building Control approval? for the building regulations side.

When can a bat survey be carried out?

The daytime check can be done all year. Dusk and dawn surveys can only be done when bats are active, usually May to September.

Who pays for a bat survey?

The person applying for planning permission arranges and pays for it.

Will bats stop my project?

Rarely. Most jobs go ahead with changes to timing or design, and a licence where one is needed.

Is a bat survey the same as an ecology survey?

No. A general ecology survey looks at the whole site and every protected species. A bat survey looks at bats only. On a larger site the ecology survey often comes first and says whether a bat survey is needed. Biodiversity Net Gain is separate again.

Get a Free Quote for Your Project

Send us the address, a few photos and your drawings. We will tell you what the council is likely to ask for and arrange the survey with the rest of your planning reports.

Last reviewed: November 2026. General guidance for England only. Rules and licensing bodies differ in Wales, Scotland and Northern Ireland. Get project-specific advice before relying on it.