Do I Need Building Control Approval?
Most building work, including new buildings, extensions, loft conversions, conversions and many alterations, has to meet the Building Regulations and be checked by a Building Control body. Planning permission is a separate thing: you may need one, both or neither.
In this guide
Work that usually needs approval
- New houses, flats and commercial buildings
- Extensions, loft and garage conversions
- Changes of use, such as office to residential, or one house into flats
- Structural alterations, such as removing load-bearing walls
- New or altered drainage, heating systems, electrics in some cases, and replacement windows (often covered by competent person schemes)
Do I need Building Control for my job?
Find your job below. These are the usual answers in England. If your job is not here, or sits between two answers, send us a sketch and we will tell you what applies.
| Job | Do you need approval? |
|---|---|
| Garage conversion | Yes. The garage becomes a room you live in, so it needs insulation, ventilation, damp proofing and a safe way out in a fire. If the garage door opening is filled in, the foundation under it is checked too. |
| Garden room or summerhouse | Not if it is small. No approval if it is detached, single storey and has no bedroom, and is either 15m² or less, or up to 30m² and at least 1 metre from every boundary (or built mainly of materials that do not burn). |
| Conservatory | Not usually. No approval if it is single storey, at ground level, under 30m², separated from the house by outside walls, doors or windows, and has its own heating with its own controls. Take out the doors to the house, or run the house heating into it, and it needs approval. A new or wider opening into the house always needs approval. |
| Porch | Not usually. No approval if it is at ground level, under 30m², and the front door between the house and the porch stays in place. The glazing and any electrics must still meet the regulations. |
| New roof or roof replacement | Often. Small repairs and replacing a few tiles do not need approval. Re-covering a large part of the roof usually does, because the insulation has to be brought up to standard. A much heavier covering needs approval too, as the roof has to carry the extra weight. Councils measure “large” in different ways, so ask before you start. |
| Solar panels on the roof | Yes, usually. The roof has to be shown to carry the weight of the panels, and may need strengthening first, and the wiring has to be safe. An installer on a competent person scheme can certify the parts of the work they are registered for. On an older roof, ask for a structural check first. |
| Internal works | Sometimes. Removing or altering a load-bearing wall needs approval and structural calculations. New drainage for a bathroom or kitchen, and most new electrical circuits, are covered too, though a registered plumber or electrician can sign off their own work. Redecorating, new kitchen units and like-for-like repairs do not need approval. |
| Permitted development | Usually yes. Permitted development is about planning permission only. It does not take away the need for Building Regulations approval, so an extension or loft conversion built under permitted development still needs it. |
The rules for small detached buildings, porches and conservatories come from Schedule 2 of the Building Regulations 2010.
Your two routes
Full plans
Drawings and calculations are checked before work starts and you get a decision. This is the normal route for new builds and anything complex.
Building notice
You give notice and work is inspected as it goes, without plan approval. It suits small domestic work and isn’t available for some building types.
Council or private?
You can use the local authority’s Building Control team or a Registered Building Control Approver (private Building Control). Both check the same regulations. Private approvers often suit developers who want one point of contact across several councils.
We manage your Building Regulations approval with a Registered Building Control Approver, from plans to completion certificate.
What the regulations cover
Structure (Part A), fire safety (B), ventilation (F), water efficiency (G), drainage (H), energy (L), overheating (O), electrical safety (P), broadband (R) and more. That is why approval usually needs supporting reports, such as SAP calculations, Water Calculations, overheating assessments, connectivity plans and structural calculations, plus air, ventilation and Sound Testing at the end.
The completion certificate
At the end, Building Control issues a completion (final) certificate. Keep it safe: solicitors, lenders and warranty providers will ask for it when the property is sold or mortgaged.
Frequently asked questions
Do I need Building Control if I have planning permission?
Usually yes. Planning permission and Building Regulations approval are separate. Planning covers what you build and where; Building Regulations cover how it’s built.
Can I start work before Building Control approval?
Under a full plans application you can legally start after giving notice, but it’s risky to build before the plans are approved. Some higher-risk buildings have stricter rules. Most developers wait for approval.
What happens if I build without Building Control?
The council can require the work to be altered or removed, and you’ll struggle to sell or mortgage the property without a completion certificate. Retrospective approval (regularisation) is possible in some cases but can mean opening up finished work.
Is private Building Control more expensive?
Not necessarily. Fees are quoted per project and are often competitive, especially for developers with several sites.
Do I need Building Control for a garage conversion?
Yes. Turning a garage into a room you live in counts as building work. Building Control checks the insulation, the ventilation, the way out in a fire, damp proofing and the foundation under any filled-in door opening.
Do I need Building Control for a garden room?
Not if it is detached, single storey, has no bedroom and is 15m² or less. Between 15m² and 30m² it is also exempt if it stands at least 1 metre from every boundary, or is built mainly of materials that do not burn. Anything bigger, or with a bedroom, needs approval.
Do I need Building Control for a conservatory?
Not usually, if it is single storey, at ground level, under 30m², separated from the house by outside doors or windows and heated on its own controls. If you remove the doors between it and the house, it is treated as an extension and needs approval.
Do I need Building Control for a new roof?
Small repairs and replacing a few tiles do not need approval. Re-covering a large part of the roof usually does, because the insulation must be improved and the roof must carry any extra weight. Ask your Building Control body before you start.
Does permitted development mean I don’t need Building Regulations approval?
No. Permitted development means you may not need planning permission. Building Regulations approval is a separate thing, and most building work still needs it.
Get a Free Quote for Your Project
We manage your Building Regulations approval with a Registered Building Control Approver, from plans to completion certificate.
Last reviewed: November 2026. General guidance for England only. Get project-specific advice before relying on it.