What Is Biodiversity Net Gain? A Guide for Developers
Biodiversity net gain (BNG) means leaving the natural habitat on and around your site in a measurably better state than before you built. In England most planning permissions now come with a legal requirement to deliver at least a 10% gain, and you need a plan for it before you can start on site.
In this guide
The short version
Who it applies to
Most new planning permissions in England. Major developments since 12 February 2024, and small sites since 2 April 2024. From 6 August 2026 most sites of 0.2 hectares or less are exempt (see below).
What you must deliver
At least a 10% increase in biodiversity value compared with the site before work, measured with the statutory biodiversity metric.
How long for
Significant on-site gains and all off-site gains must be secured and managed for at least 30 years.
When it bites
BNG is a condition of your permission. A biodiversity gain plan has to be approved by the council before development can begin.
How biodiversity is measured
An ecologist surveys the site and records each habitat (grassland, hedgerows, trees, ponds and so on) with its size, condition and how distinctive it is. These go into the statutory biodiversity metric, which turns them into “biodiversity units”. The same is done for your proposed layout, including new planting, green roofs, ponds and hedgerows. The difference between the two scores shows whether you hit the 10% target.
Hedgerows and rivers or streams are scored separately from area habitats, and each needs its own 10% gain.
Your three ways to deliver the gain
- On site: design the landscaping to create or improve habitat. This is usually cheapest when it’s planned early, before the layout is fixed.
- Off site: buy biodiversity units from a registered habitat bank, or create habitat on other land you control and register it.
- Statutory credits: buy credits from the government as a last resort, when on-site and off-site options aren’t available. They’re deliberately priced high.
Avoid harm first and keep statutory credits as the last resort. For major developments the order then matters: deliver on site where you can before going off site (the “biodiversity gain hierarchy”). For applications made from 6 August 2026, smaller (non-major) developments can choose between on-site and registered off-site gains on an equal footing.
Exemptions
The exemptions changed on 6 August 2026. For planning applications made on or after that date, these are exempt:
- small sites of 0.2 hectares or less (measured by the red-line boundary) that are not major development and don’t affect a priority habitat;
- householder applications (extensions and alterations to an existing home);
- development that affects less than 25 square metres of habitat or 5 metres of hedgerow, and doesn’t affect any priority habitat (the “de minimis” exemption);
- some temporary development and other categories set out in the regulations.
The separate self-build and custom-build exemption has ended for applications made from 6 August 2026. Most self-build plots are 0.2 hectares or less, so they are usually covered by the new small sites exemption instead. Applications made before 6 August 2026 are judged under the rules at the time.
Does my small site need BNG in 2026?
Work through these in order:
- When was (or will) the application be made? On or after 6 August 2026, the new rules below apply.
- Is it major development? For example 10 or more homes, or a site of 0.5 hectares or more for housing. Major development is never covered by the small sites exemption.
- Is the red-line boundary 0.2 hectares or less? That is 2,000 square metres, roughly a third of a football pitch.
- Does it affect a priority habitat? If it does, the exemption doesn’t apply, however small the site.
If it’s non-major, 0.2 hectares or less and affects no priority habitat, BNG doesn’t apply. If you’re not sure, for example where hedgerows, ponds or old grassland are involved, send us the site plan and we’ll check before you apply.
We arrange the ecology survey, metric calculation and biodiversity gain plan, quoted together with the other reports your application needs.
What you need, and when
With the planning application
A pre-development baseline, a draft metric and a statement of how you’ll reach 10%.
Before you start on site
The biodiversity gain plan, approved by the council to discharge the BNG condition.
After completion
Habitat management and monitoring for the agreed period, usually under a planning obligation or conservation covenant.
Frequently asked questions
Does biodiversity net gain apply to my planning application?
If your site is in England and the application isn’t exempt, almost certainly yes. Major developments have been covered since 12 February 2024 and small sites since 2 April 2024. Householder applications, very small habitat losses and, for applications made from 6 August 2026, most non-major sites of 0.2 hectares or less are exempt.
How much does a biodiversity net gain assessment cost?
It depends mostly on the site size and how much habitat is on it, because that drives the ecology survey time. A small, previously developed plot costs far less than a greenfield site with hedgerows and ponds. Send us the site address and plans for a fixed quote.
Can I buy biodiversity units instead of providing habitat on site?
Yes, from a registered habitat bank, but only after you’ve looked at what you can reasonably deliver on site. Government statutory credits are a last resort.
When do I need the biodiversity gain plan?
Before development begins. It’s approved by the local planning authority as a pre-commencement requirement, so allow time for it in your programme.
Is my self-build exempt from biodiversity net gain?
For applications made from 6 August 2026 the self-build exemption has been replaced. Most single self-build plots are 0.2 hectares or less, so they fall under the new small sites exemption, as long as the scheme isn’t major development and doesn’t affect a priority habitat.
What is the 0.2 hectare BNG exemption?
From 6 August 2026, non-major development on a site of 0.2 hectares (2,000 square metres) or less, measured by the red-line boundary, doesn’t need to deliver biodiversity net gain unless it affects a priority habitat.
Get a Free Quote for Your Project
We arrange the ecology survey, metric calculation and biodiversity gain plan, quoted together with the other reports your application needs.
Last reviewed: October 2026 (updated for the 6 August 2026 changes). General guidance for England only. Rules change and every site is different, so get project-specific advice before relying on it.