Project

Hazardous Waste Offices

A two-storey steel-framed commercial and laboratory unit with offices on the first floor.

Hazardous Waste Offices - project photo 1
Scheme
Two-storey laboratory and office unit
Type
Commercial
Site inspections
5
Services
1
Status
Complete 2023

About the project

This is a two-storey commercial and laboratory unit for a hazardous waste operation, with offices on the first floor.

We provided Building Control, checking compliance through construction, including structure, fire safety and ventilation.

Our first visit was in June 2023, when the pad foundations were inspected against the structural engineer's design in medium shrinkable clay. By October the steel frame was up on a blue brick substructure and the first floor decking was going in, across five inspection visits.

On site

The build, stage by stage

  1. Hazardous Waste Offices - Foundations

    Jun 2023

    Foundations

    Pad foundations were excavated to the structural engineer's design and concreted with the frame bolts in position.

  2. Hazardous Waste Offices - Walls

    Oct 2023

    Walls

    Blue brick substructure reached DPC and the steel frame was installed to the engineer's design.

  3. Hazardous Waste Offices - Floors

    Oct 2023

    Floors

    Steel floor decking went in at first floor, with underfloor heating loops laid ready for the concrete.