A returning client came to us for building control on a two-storey rear extension at Fox's Covert in Fenny Drayton.
The job moved at a good pace through spring 2023. Foundations went in during early May at 1.0m deep in medium shrinkable clay, followed by foul drainage and the insulated floor later that month. The blockwork was complete by early June, with a 150mm fully filled cavity.
By the end of June first fix electrics and plumbing were under way and the ensuite was taking shape, all with the client living in the house while the work was carried out.