Project

Delves Farm

Boulters Lane, Atherstone

Phase 3 of a new housing development at Delves Farm, Atherstone, with sustainable drainage designed by us.

Delves Farm, Boulters Lane, Atherstone - project photo 1
Scheme
Housing development, Phase 3
Type
New build
Services
3
Status
Complete

About the project

Delves Farm on Boulters Lane, Atherstone, is a new housing development for a repeat client, and this is Phase 3. We delivered Building Control, the 10 Year Structural Warranty and the Sustainable Drainage Systems design.

Our team produced the drainage model, calculations and drawings, aiming for the most cost-effective drainage strategy for the developer. The system was designed to discharge into a manmade pond.

On site the houses went up in traditional brick with trussed roofs, then on to fitted kitchens and carpets inside and lawns and driveways outside.

On site

The build, stage by stage

  1. Delves Farm, Boulters Lane, Atherstone - Foundations

    Stage 1

    Foundations

    Substructure brickwork and blockwork came up out of the ground on each plot.

  2. Delves Farm, Boulters Lane, Atherstone - Walls

    Stage 2

    Walls

    Brickwork went up under scaffold on the houses.

  3. Delves Farm, Boulters Lane, Atherstone - Roof

    Stage 3

    Roof

    Roof trusses were set out across the plots.

  4. Delves Farm, Boulters Lane, Atherstone - Finishes

    Stage 4

    Finishes

    Kitchens, flooring and decoration were completed inside.

  5. Delves Farm, Boulters Lane, Atherstone - Complete

    Stage 5

    Complete

    The finished houses stand with their lawns and driveways in place.